Browse
Search
Planning Board - 110420 Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:53:22 AM
Creation date
10/29/2020 10:49:20 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />I-40/85 Westbound Service Road and East RI-RO Driveway: <br /> <br /> Provide one northbound ingress lane and one southbound egress lane with stop <br />control on the driveway <br /> Provide a minimum 100’ internal protected stem length <br /> Provide a westbound exclusive right turn lane with 150’ of full storage and <br />appropriate deceleration and transition accommodation per NCDOT requirements <br /> <br />I-40/85 Westbound Service Road and West RI-RO Driveway: <br /> <br /> Provide one northbound ingress lane and one southbound egress lane with stop <br />control on the driveway <br /> Provide a minimum 100’ internal protected stem length <br /> Provide a westbound exclusive right turn lane with 200’ of full storage and <br />appropriate transition per NCDOT requirements <br /> <br />I-40/85 Westbound Service Road and Mt. Willing Road: <br /> <br /> Provide a three-lane westbound approach consisting of the following: <br />o One full single thru lane <br />o One exclusive continuous right turn lane <br />o One exclusive left turn lane with 280’ of full storage and appropriate <br />transitions per NCDOT requirements. <br /> Provide a coordinated traffic signal at this intersection. <br /> <br />I-40/85 Eastbound Ramp and I-85/US 70 Connector Intersection: <br /> <br /> Provide a two-lane eastbound approach consisting of the following: <br />o One full combination thru-left-right turn lane <br />o One exclusive left turn lane with 400’ of full storage and appropriate <br />transitions per NCDOT requirements <br /> Extend existing southbound left turn lane to provide for 400’of full storage and <br />appropriate transitions per NCDOT requirements <br /> Provide a coordinated traffic signal at this intersection. <br /> <br />I-40/85 Westbound Ramp and I-85/US 70 Connector Intersection: <br /> <br /> Provide a three-lane northbound approach consisting of the following: <br />o Dual full thru-lanes <br />o One exclusive left turn lane with 250’ of full storage and appropriate <br />transition per NCDOT requirements <br /> Provide a four-lane westbound approach consisting of the following: <br />o One full thru lane <br />137
The URL can be used to link to this page
Your browser does not support the video tag.