Orange County NC Website
1 <br />Michael Harvey <br />From:Beth Trahos <beth.trahos@nelsonmullins.com> <br />Sent:Friday, October 23, 2020 11:43 AM <br />To:Michael Harvey <br />Cc:Stan Beard; Westwood, Kelsey <br />Subject:FW: [EXTERNAL] Eno 100Kv Line Relocation <br />Michael‐  <br />  <br />Below please find an email from Duke Energy indicating conceptual approval for the powerline relocation. Final approval  <br />will come with delineation of the easement meeting all Duke Energy standards before physical relocation takes place.  <br />  <br />Let me know if you have any questions.  Thanks, and have a great weekend!  <br />  <br />Beth  <br />  <br /> <br /> <br />ELIZABETH C. TRAHOS PARTNER <br />beth.trahos@nelsonmullins.com <br />GLENLAKE ONE | SUITE 200 <br />4140 PARKLAKE AVENUE | RALEIGH, NC 27612 <br />T 919.329.3884 F 919.329.3799 <br /> <br />NELSONMULLINS.COM VCARD VIEW BIO <br />  <br />  <br />  <br />From: Plumley, Lisa <Lisa.Plumley@duke‐energy.com>   <br />Sent: Wednesday, October 21, 2020 1:37 PM  <br />To: Stan Beard <Stan.Beard@buc‐ees.com>; Holleman, Leah Alexandra <Leah.Holleman@duke‐energy.com>; Pait, Bruce  <br />E. <Bruce.Pait@duke‐energy.com>  <br />Cc: Scott Ratcliff <ratcliffeng@gmail.com>  <br />Subject: RE: [EXTERNAL] Eno 100Kv Line Relocation   <br />  <br />Stan,  <br />  <br />So sorry for the delay in response, I wanted to double check that both Engineering and Asset Protection groups were OK  <br />with the plans from a conceptual standpoint. Engineering (Leah Holleman) approves, and I have Bruce’s response copied  <br />below:  <br />  <br />At this level, Transmission Asset Protection does not object to the project moving forward subject to the  <br />following:  <br />  <br />1. We want to ensure that we have a new easement that is clear of structures and obstructions from edge to  <br />edge and good access to the easement and all of our future structure locations.  <br />  <br />133