10/13/2020 Page 3 of 4 <br />Kelsey Westwood Hall, P.E. MPD for Beaver Crossing – Engineering Comments <br />that NCDEQ and OAWS design criteria and/or direction are <br />followed specific to the proposed dead end water line. <br />vi. Water utility design, permitting, and construction shall conform to <br />NCDEQ and/or OAWS standards. <br />c. SEWER: <br />i. Sewer service will likely be provided by City of Mebane. This <br />statement shall in no way be interpreted as a final determination by <br />Orange County or City of Mebane to serve the Project with public <br />sewer. <br />ii. City of Mebane staff has informally notified Orange County <br />Engineering staff that the City of Mebane has available sewer <br />capacity based on the evaluation of a DRAFT sanitary sewer <br />capacity summary (average daily demand) of 76,421 gallons per <br />day (GPD) as provided to Orange County by the applicant on <br />September 1, 2020. However, the City of Mebane has not yet <br />formally confirmed with Orange County Engineering staff an ability <br />to serve the Project with public sewer. Only limited sewer demand <br />data have been made available to Orange County Engineering staff <br />to date. <br />iii. So as to prevent a potentially negative impact to available public <br />sewer capacity within the regional sewer service area, Orange <br />County Engineering staff recommends a reassessment of proposed <br />sewer demands via the incorporation of low-flow water fixtures <br />and/or lower-flow end users throughout the Project, where feasible. <br />iv. If updated sewer demands are available, applicant shall provide <br />them to City of Mebane so that City of Mebane may further <br />evaluate their available sewer capacity and their desire to serve the <br />Project with public water. <br />v. The existing terminal sewer manhole along Mt. Willing Road is <br />located in front of Orange County PIN 9844965832, slightly south of <br />where currently shown on the preliminary Water and Sewer Map as <br />submitted to Orange County. See Attachment 2. <br />i. Sewer utility design, permitting, and construction shall conform to <br />NCDEQ and/or City of Mebane standards. <br />d. STORMWATER MANAGEMENT: <br />i. Stormwater management design, permitting, and construction shall <br />conform to Section 6.14 of the Orange County Unified Development <br />Ordinance (UDO). <br />e. EROSION & SEDIMENTATION CONTROL <br />i. Erosion & Sedimentation Control (E&SC) design, permitting, and <br />construction shall conform to Section 6.15 of the Orange County <br />Unified Development Ordinance (UDO). <br />128