Orange County NC Website
West Orange Site - Addendum #2 Phase 1 - Build Saturday - Site Drwy. Shift <br />5: US-70/I-40 Connector Road & I-40 EB Service Road 09/14/2020 <br />K:\DUR_LDEV\013284003 West Orange Site\T10 - Addendum 2 - Site Drwy Shift\Phase 1\Synchro\Phase1-Build Sat-SiteDrwyShift.syn <br />Kimley-Horn Page 2 <br />Cycle Length: 120 <br />Actuated Cycle Length: 120 <br />Offset: 59 (49%), Referenced to phase 2:NBT and 6:SBTL, Start of Green <br />Natural Cycle: 90 <br />Control Type: Actuated-Coordinated <br />Maximum v/c Ratio: 0.90 <br />Intersection Signal Delay: 47.9 Intersection LOS: D <br />Intersection Capacity Utilization 84.2%ICU Level of Service E <br />Analysis Period (min) 15 <br /># 95th percentile volume exceeds capacity, queue may be longer. <br /> Queue shown is maximum after two cycles. <br />m Volume for 95th percentile queue is metered by upstream signal. <br />Splits and Phases: 5: US-70/I-40 Connector Road & I-40 EB Service Road <br />992