Orange County NC Website
West Orange Site - Addendum #2 Phase 1 - Build AM - Site Drwy. Shift <br />11: US-70/I-40 Connector Road & Site Driveway 09/14/2020 <br />K:\DUR_LDEV\013284003 West Orange Site\T10 - Addendum 2 - Site Drwy Shift\Phase 1\Synchro\Phase1-Build AM-SiteDrwyShift.syn <br />Kimley-Horn Page 8 <br />Area Type:Other <br />Cycle Length: 120 <br />Actuated Cycle Length: 120 <br />Offset: 42 (35%), Referenced to phase 2:NBT and 6:SBT, Start of Green <br />Natural Cycle: 50 <br />Control Type: Actuated-Coordinated <br />Maximum v/c Ratio: 0.62 <br />Intersection Signal Delay: 15.3 Intersection LOS: B <br />Intersection Capacity Utilization 47.6%ICU Level of Service A <br />Analysis Period (min) 15 <br />Splits and Phases: 11: US-70/I-40 Connector Road & Site Driveway <br />982