Orange County NC Website
West Orange Site - Addendum #2 Phase 1 - Build AM - Site Drwy. Shift <br />5: US-70/I-40 Connector Road & I-40 EB Service Road 09/14/2020 <br />K:\DUR_LDEV\013284003 West Orange Site\T10 - Addendum 2 - Site Drwy Shift\Phase 1\Synchro\Phase1-Build AM-SiteDrwyShift.syn <br />Kimley-Horn Page 2 <br />Cycle Length: 120 <br />Actuated Cycle Length: 120 <br />Offset: 80 (67%), Referenced to phase 2:NBT and 6:SBTL, Start of Green <br />Natural Cycle: 55 <br />Control Type: Actuated-Coordinated <br />Maximum v/c Ratio: 0.79 <br />Intersection Signal Delay: 34.6 Intersection LOS: C <br />Intersection Capacity Utilization 66.9%ICU Level of Service C <br />Analysis Period (min) 15 <br />m Volume for 95th percentile queue is metered by upstream signal. <br />Splits and Phases: 5: US-70/I-40 Connector Road & I-40 EB Service Road <br />976