Browse
Search
Planning Board - 110420 Attachment 1
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Attachment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:49:09 AM
Creation date
10/29/2020 10:32:12 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1075
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERSECTION ANALYSIS SHEET <br />AM In AM Out PM In PM Out <br />Project:Buc-ee's Phase 2 Net New Trips:711 630 968 893 <br />Location:Efland NC Pass-By Trips:0 0 0 0 <br />Scenario:Addendum #2 - Weekday Peak <br />Peak Hour:7:30 - 8:30 AM; 5:00 - 6:00 PM <br />Ct. Date 5/22/2019 <br />N/S Street:US-70/I-40 Connector Road Annual Growth Rate:2.0%Existing Year:2019 <br />E/W Street:Site Driveway Growth Factor:0.061208 Buildout Year:2022 <br />AM PEAK HOUR <br />AM PHF = 0.90 <br />Description Left Through Right Left Through Right U-Turn Left Through Right Left Through Right <br />2019 Traffic Count 0 0 0 0 0 0 0 0 0 0 0 0 0 <br />Count Balancing 0 0 0 0 0 0 0 0 313 0 0 350 0 <br />2019 Existing Traffic 0 0 0 0 0 0 0 0 313 0 0 350 0 <br />Growth Factor (0.02 per year)0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 <br />2022 Background Growth 0 0 0 0 0 0 0 0 19 0 0 21 0 <br />2022 Background Traffic 0 0 0 0 0 0 0 0 332 0 0 371 0 <br />Project Traffic <br />Percent Assignment Inbound 0%0%0%0%0%0%0%53%0%0%0%0%2% <br />Inbound Project Traffic 0 0 0 0 0 0 0 377 0 0 0 0 14 <br />Percent Assignment Outbound 2%0%49%0%0%0%0%0%0%0%0%0%0% <br />Outbound Project Traffic 13 0 309 0 0 0 0 0 0 0 0 0 0 <br />Total Project Traffic 13 0 309 0 0 0 0 377 0 0 0 0 14 <br />Ben Johnston RI/RO Diversion 0 0 0 0 0 0 99 0 0 0 0 0 0 <br />2022 Buildout Total 13 0 309 0 0 0 99 377 332 0 0 371 14 <br />Percent Impact (Approach) <br />47.1% <br />PM PEAK HOUR <br />PM PHF = 0.90 <br />Description Left Through Right Left Through Right U-Turn Left Through Right Left Through Right <br />2019 Traffic Count 0 0 0 0 0 0 0 0 0 0 0 0 0 <br />Count Balancing 0 0 0 0 0 0 0 0 331 0 0 302 0 <br />2019 Existing Traffic 0 0 0 0 0 0 0 0 331 0 0 302 0 <br />Growth Factor (0.02 per year)0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 <br />2022 Background Growth 0 0 0 0 0 0 0 0 20 0 0 18 0 <br />2022 Background Traffic 0 0 0 0 0 0 0 0 351 0 0 320 0 <br />Project Traffic <br />Percent Assignment Inbound 0%0%0%0%0%0%0%53%0%0%0%0%2% <br />Inbound Project Traffic 0 0 0 0 0 0 0 512 0 0 0 0 19 <br />Percent Assignment Outbound 2%0%49%0%0%0%0%0%0%0%0%0%0% <br />Outbound Project Traffic 18 0 438 0 0 0 0 0 0 0 0 0 0 <br />Total Project Traffic 18 0 438 0 0 0 0 512 0 0 0 0 19 <br />Ben Johnston RI/RO Diversion 0 0 0 0 0 0 160 0 0 0 0 0 0 <br />2022 Buildout Total 18 0 438 0 0 0 160 512 351 0 0 320 19 <br />Percent Impact (Approach) <br />54.3% <br />k:\dur_ldev\013284003 west orange site\t10 - addendum 2 - site drwy shift\phase 1\[phase1-sitedrwyshift-west orange site - weekday - tia data.xls]int. #11 9/14/20 <br />Site Driveway US-70/I-40 Connector Road US-70/I-40 Connector Road <br />Eastbound Westbound Northbound Southbound <br />100.0%-46.7%3.6% <br />Overall Percent Impact <br />Site Driveway US-70/I-40 Connector Road US-70/I-40 Connector Road <br />Eastbound Westbound Northbound Southbound <br />100.0%-50.0%5.6% <br />Overall Percent Impact <br />969
The URL can be used to link to this page
Your browser does not support the video tag.