Browse
Search
Planning Board - 110420 Attachment 1
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Attachment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:49:09 AM
Creation date
10/29/2020 10:32:12 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1075
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Will the project involve a land application system for treatment of <br />wastewater? No <br /> <br />If yes, describe _ N/A_______________________________________________ <br /> <br />________________________________________________________________ <br /> <br />Has an application for a non -discharge permit been submitted to the NC <br />Department of Environmental Management or Orange County Department of <br />Environmental Health? n/a <br /> <br /> <br />4. Is a septic tank system proposed which as a design capacity of more than <br />3000 gallons per day? No <br /> <br />If yes, describe _ N/A_______________________________________________ <br /> <br />________________________________________________________________ <br /> <br />Has an application for a non -discharge permit been submitted to the NC <br />Department of Environmental Management or Orange County Department of <br />Environmental Health? <br /> <br /> <br />5. Does the activity involve sludge disposal? No <br /> <br />If yes, where is the source of the sludge? ___ N/A________________________ <br /> <br />________________________________________________________________ <br /> <br />Describe where and how the sludge is being disposed. <br /> <br />__ N/A___________________________________________________________ <br /> <br />________________________________________________________________ <br /> <br />Has a NPDES permit from the NC Division of Environmental Management been <br />issued? __ N/A_____________________________ <br /> <br /> <br />6. Water Usage <br /> <br />[Note – employee numbers are unknown at this point but will be provided to <br />Orange County once determined. Process water is anticipated to be needed for a <br />carwash facility, exact amounts and percentages will be provided to Orange <br />County once determined. Projected land use will not utilize any production water <br />as no production will occur on the parcels.] <br /> <br />a. Estimated no. of employees ____ x 25 gpd = _____ gpd <br />b. Estimated water use for climate control = _____ gpd <br />96
The URL can be used to link to this page
Your browser does not support the video tag.