Browse
Search
Planning Board - 110420 Attachment 1
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Attachment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:49:09 AM
Creation date
10/29/2020 10:32:12 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1075
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br />kimley-horn.com 300 Morris Street, Suite 200, Durham, NC 27701 919 682 3583 <br /> <br />Recommendations <br />In the scenario where US-70/I-40 Connector site access is shifted approximately 400 feet north of <br />Ben Johnston Road, the following improvements were identified to accommodate Phase 1 and <br />Phase 2 site traffic in addition to those recommended in “Buc-ee’s Traffic Addendum #1”: <br />US-70/I-40 Connector – Ben Johnston Road <br /> Convert Ben Johnston Road to a right-in/right-out configuration with one ingress lane and one <br />egress lane <br /> <br />US-70/I-40 Connector – Ben Johnston Road/Site Driveway <br /> Construct a site driveway on US-70/I-40 Connector Road approximately 400 feet north of Ben <br />Johnston Road. The driveway should provide two ingress lanes and three egress lanes: a left- <br />turn lane with 200 feet of storage, a continuous right-turn lane, and a right-turn lane with 300 <br />feet of storage <br /> Construct dual northbound left-turn lanes, each with 300 feet of storage and appropriate tapers <br />on US-70/I-40 Connector <br /> Install a traffic signal <br /> <br />Recommended roadway laneage is shown on Figure 10. <br />Based on the capacity analyses presented herein, all of the study intersections are expected to <br />operate acceptably in Phase 1 and 2 build-out traffic conditions. <br />Should you have any questions or comments, please do not hesitate to contact me at (919) 653- <br />5874 or earl.lewellyn@kimley-horn.com. <br /> <br /> <br /> <br />Appendices <br />Appendix A: Figures 1 – 10 <br />Appendix B: Phase 2 Intersection Spreadsheets – with Shifted Site Driveway <br />Appendix C: Phase 2 Synchro and SimTraffic Outputs – with Shifted Site Driveway <br />952
The URL can be used to link to this page
Your browser does not support the video tag.