Orange County NC Website
II. PROJECT DESCRIPTION <br />A. Describe proposed use of property: <br />The project proposes to construct a Buc -ee’s gas station and convenience store <br />with associated parking and infrastructure within an undeveloped/farm land <br />property located between Mt. Willing Road and the I-85/US-70 Connector. The <br />project will include new driveways to Mt. Willing Road, the I-40/I-85 Ramp, and <br />the I-85/US-70 Connector. <br /> <br />B. Number of lots: 5 (including proposed outparcels) <br /> <br />C. Number of structures: 1 <br /> <br />D. Estimated square footage of area to be graded for development of attached <br />residential units (excluding roads, but including parking areas) N/A <br /> <br />E. Estimated square footage of area to be graded for non-residential use (excluding <br />roads) <br /> <br />Building Graded Area: 306,281SF <br />Parking Graded Area: 1,119,610SF <br /> <br />F. Estimated area to be graded for roads: 433,512 SF <br />Road Type: Public __________ Private ___X_____ <br />Class A _________ <br />Class B _________ <br />Total road length _____7,286LF________ <br /> <br />III. STATE PERMITS REQUIRED <br /> <br />1. Does the project involve the mining of earth products? No <br /> <br />If so, how many cubic feet of material are expected to be excavated? <br /> <br />_N/A____________________________________________________________ <br /> <br />94