Orange County NC Website
West Orange Site Phase 1 - Build Saturday - Trip Gen. Adjust. <br />Queuing and Blocking Report 09/10/2020 <br />Kimley-Horn Page 3 <br />Intersection: 1: Efland-Cedar Grove Road & US-70 <br />Movement EB WB NB SB <br />Directions Served LTR LTR LTR LTR <br />Maximum Queue (ft)92 157 94 117 <br />Average Queue (ft)39 44 57 65 <br />95th Queue (ft)77 93 88 104 <br />Link Distance (ft)835 931 388 929 <br />Upstream Blk Time (%) <br />Queuing Penalty (veh) <br />Storage Bay Dist (ft) <br />Storage Blk Time (%) <br />Queuing Penalty (veh) <br />Intersection: 2: Mt. Willing Road & Forrest Avenue <br />Movement EB WB <br />Directions Served TR LT <br />Maximum Queue (ft)98 73 <br />Average Queue (ft)52 31 <br />95th Queue (ft)79 57 <br />Link Distance (ft)912 878 <br />Upstream Blk Time (%) <br />Queuing Penalty (veh) <br />Storage Bay Dist (ft) <br />Storage Blk Time (%) <br />Queuing Penalty (veh) <br />Intersection: 3: Mt. Willing Road & I-40 WB Entrance Ramp/I-40 WB Service Road <br />Movement WB WB NB NB SB <br />Directions Served L T L T T <br />Maximum Queue (ft)70 176 24 50 97 <br />Average Queue (ft)19 85 6 15 55 <br />95th Queue (ft)53 146 21 41 97 <br />Link Distance (ft)512 601 1801 <br />Upstream Blk Time (%) <br />Queuing Penalty (veh) <br />Storage Bay Dist (ft)280 225 <br />Storage Blk Time (%) <br />Queuing Penalty (veh) <br />Intersection: 4: Mt. Willing Road & I-40 EB Exit Ramp/I-40 EB Service Road <br />Movement EB SB <br />Directions Served LT L <br />Maximum Queue (ft)48 52 <br />Average Queue (ft)22 14 <br />95th Queue (ft)42 40 <br />Link Distance (ft)685 <br />Upstream Blk Time (%) <br />Queuing Penalty (veh) <br />Storage Bay Dist (ft)225 <br />Storage Blk Time (%) <br />Queuing Penalty (veh) <br />852