Browse
Search
Planning Board - 110420 Attachment 1
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Attachment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:49:09 AM
Creation date
10/29/2020 10:32:12 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1075
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Orange Site Phase 1 - Build PM - Trip Gen. Adjust. <br />Queuing and Blocking Report 09/10/2020 <br />Kimley-Horn Page 3 <br />Intersection: 1: Efland-Cedar Grove Road & US-70 <br />Movement EB WB NB SB <br />Directions Served LTR LTR LTR LTR <br />Maximum Queue (ft)92 196 359 117 <br />Average Queue (ft)50 101 134 61 <br />95th Queue (ft)85 171 221 99 <br />Link Distance (ft)835 931 388 929 <br />Upstream Blk Time (%) <br />Queuing Penalty (veh) <br />Storage Bay Dist (ft) <br />Storage Blk Time (%) <br />Queuing Penalty (veh) <br />Intersection: 2: Mt. Willing Road & Forrest Avenue <br />Movement EB WB <br />Directions Served TR LT <br />Maximum Queue (ft)127 94 <br />Average Queue (ft)57 33 <br />95th Queue (ft)89 65 <br />Link Distance (ft)912 878 <br />Upstream Blk Time (%) <br />Queuing Penalty (veh) <br />Storage Bay Dist (ft) <br />Storage Blk Time (%) <br />Queuing Penalty (veh) <br />Intersection: 3: Mt. Willing Road & I-40 WB Entrance Ramp/I-40 WB Service Road <br />Movement WB WB NB NB SB <br />Directions Served L T L T T <br />Maximum Queue (ft)249 186 23 92 74 <br />Average Queue (ft)98 74 5 24 40 <br />95th Queue (ft)176 133 19 57 83 <br />Link Distance (ft)512 601 1801 <br />Upstream Blk Time (%) <br />Queuing Penalty (veh) <br />Storage Bay Dist (ft)280 225 <br />Storage Blk Time (%) <br />Queuing Penalty (veh) <br />Intersection: 4: Mt. Willing Road & I-40 EB Exit Ramp/I-40 EB Service Road <br />Movement EB SB <br />Directions Served LT L <br />Maximum Queue (ft)51 51 <br />Average Queue (ft)26 16 <br />95th Queue (ft)45 42 <br />Link Distance (ft)685 <br />Upstream Blk Time (%) <br />Queuing Penalty (veh) <br />Storage Bay Dist (ft)225 <br />Storage Blk Time (%) <br />Queuing Penalty (veh) <br />845
The URL can be used to link to this page
Your browser does not support the video tag.