Orange County NC Website
West Orange Site Phase 1 - Build Saturday - Trip Gen. Adjust. <br />1: Efland-Cedar Grove Road & US-70 09/10/2020 <br />K:\DUR_LDEV\013284003 West Orange Site\T10 - Addendum 1 Rev - Trip Gen & Dist Adjustment\Phase 1\Analysis\Synchro\Phase1-Build Saturday-TripGenAdjust.syn <br />Kimley-Horn Synchro 10 Report <br />Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Reduced v/c Ratio 0.13 0.11 0.14 0.18 <br />Intersection Summary <br />Area Type:Other <br />Cycle Length: 100 <br />Actuated Cycle Length: 34.5 <br />Natural Cycle: 50 <br />Control Type: Actuated-Uncoordinated <br />Maximum v/c Ratio: 0.53 <br />Intersection Signal Delay: 10.8 Intersection LOS: B <br />Intersection Capacity Utilization 42.0%ICU Level of Service A <br />Analysis Period (min) 15 <br />Description: 07-1686 <br />Splits and Phases: 1: Efland-Cedar Grove Road & US-70 <br />818