Orange County NC Website
West Orange Site Phase 1 Build AM - Trip Gen. Adjust. <br />7: US-70/I-40 Connector Road & Site Driveway/Ben Johnston Road 09/10/2020 <br />K:\DUR_LDEV\013284003 West Orange Site\T10 - Addendum 1 Rev - Trip Gen & Dist Adjustment\Phase 1\Analysis\Synchro\Phase1-Build AM-TripGenAdjust.synSynchro 10 Report <br />Kimley-Horn Page 15 <br />Area Type:Other <br />Cycle Length: 120 <br />Actuated Cycle Length: 120 <br />Offset: 11 (9%), Referenced to phase 2:NBT and 6:SBTL, Start of Green <br />Natural Cycle: 50 <br />Control Type: Actuated-Coordinated <br />Maximum v/c Ratio: 0.64 <br />Intersection Signal Delay: 18.0 Intersection LOS: B <br />Intersection Capacity Utilization 50.4%ICU Level of Service A <br />Analysis Period (min) 15 <br />Splits and Phases: 7: US-70/I-40 Connector Road & Site Driveway/Ben Johnston Road <br />794