Orange County NC Website
West Orange Site Phase 1 Build AM - Trip Gen. Adjust. <br />3: Mt. Willing Road & I-40 WB Entrance Ramp/I-40 WB Service Road 09/10/2020 <br />K:\DUR_LDEV\013284003 West Orange Site\T10 - Addendum 1 Rev - Trip Gen & Dist Adjustment\Phase 1\Analysis\Synchro\Phase1-Build AM-TripGenAdjust.syn <br />Kimley-Horn Synchro 10 Report <br />Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBT, Start of Green <br />Natural Cycle: 50 <br />Control Type: Actuated-Coordinated <br />Maximum v/c Ratio: 0.61 <br />Intersection Signal Delay: 10.8 Intersection LOS: B <br />Intersection Capacity Utilization 67.7%ICU Level of Service C <br />Analysis Period (min) 15 <br />Splits and Phases: 3: Mt. Willing Road & I-40 WB Entrance Ramp/I-40 WB Service Road <br />786