Browse
Search
Planning Board - 110420 Attachment 1
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Attachment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:49:09 AM
Creation date
10/29/2020 10:32:12 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1075
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERSECTION ANALYSIS SHEET <br />Sat In Sat Out <br />Project:West Orange Site - Addendum #1 Net New Trips:90 73 <br />Location: Efland, NC Pass-By Trips:75 68 <br />Scenario: Phase 2 - Saturday Peak Hour <br />Peak Hour: 11:00 AM - 12:00 PM <br />Ct. Date 10/26/2019 <br />N/S Street: US-70/I-40 Connector Road Annual Growth Rate:2.0%Existing Year:2020 <br />E/W Street: I-40 WB Exit Ramp Growth Factor:0.061208 Buildout Year:2023 <br />AM PEAK HOUR <br />AM PHF = 0.96 <br />Description Left Through Right Left Through Right Left Through Right Left Through Right <br />2020 Traffic Count 0 0 0 7 4 18 2 190 0 0 33 197 <br />Count Balancing 0 0 0 0 0 0 0 0 0 0 0 0 <br />2020 Existing Traffic 0 0 0 7 4 18 2 190 0 0 33 197 <br />Growth Factor (0.02 per year)0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 <br />2023 Background Growth 0 0 0 0 0 1 0 12 0 0 2 12 <br />I-40 WB Off-Ramp Closure Diversion 0 0 0 0 220 0 0 0 0 0 0 0 <br />2023 Background Traffic 0 0 0 7 224 19 2 202 0 0 35 209 <br />Project Traffic <br />Buc-ee's Traffic w/ Reassignment 0 0 0 0 344 303 83 69 0 0 634 0 <br />Phase 2 Traffic <br />Percent Assignment Inbound 0% 0% 0% 0% 0% 43% 0% 0% 0% 0% 0% 0% <br />Inbound Project Traffic 0 0 0 0 0 39 0 0 0 0 0 0 <br />Percent Assignment Outbound 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 43% 0% <br />Outbound Project Traffic 0 0 0 0 0 0 0 0 0 0 31 0 <br />Total External Site Traffic 0 0 0 0 0 39 0 0 0 0 31 0 <br />Pass-By Capture Reduction 0 0 0 0 0 0 0 0 0 0 0 0 <br />Pass-By Capture Assignment 0 0 0 0 0 30 0 4 0 0 3 31 <br />Total Pass-By Traffic 0 0 0 0 0 30 0 4 0 0 3 31 <br />Total Phase 2 Traffic 0 0 0 0 0 69 0 4 0 0 34 31 <br />Total Project Traffic 0 0 0 0 344 372 83 73 0 0 668 31 <br />2023 Buildout Total 0 0 0 7 568 391 85 275 0 0 703 240 <br />Percent Impact (Approach) <br />69.2% <br />k:\dur_ldev\013284003 west orange site\t10 - addendum 1 rev - trip gen & dist adjustment\phase 2\[phase2-adjustedtripgen&dist-west orange site - saturday - tia data.xls]int. #6 9/11/20 <br />Overall Percent Impact <br />-74.1%43.3%74.1% <br />Eastbound Westbound Northbound Southbound <br />I-40 WB Exit Ramp US-70/I-40 Connector Road US-70/I-40 Connector Road <br />775
The URL can be used to link to this page
Your browser does not support the video tag.