Browse
Search
Planning Board - 110420 Attachment 1
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Attachment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:49:09 AM
Creation date
10/29/2020 10:32:12 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1075
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERSECTION ANALYSIS SHEET <br />AM In AM Out PM In PM Out <br />Project:West Orange Site - Addendum #1 Net New Trips:152 45 106 113 <br />Location:Efland, NC Pass-By Trips:4 3 52 39 <br />Scenario:Phase 2 - Weekday Peak Hours <br />Peak Hour:7:30 - 8:30 AM; 5:00 - 6:00 PM <br />Ct. Date 5/21/2019 <br />N/S Street:US-70/I-40 Connector Road Annual Growth Rate:2.0%Existing Year:2020 <br />E/W Street:I-40 EB Service Road Growth Factor:0.061208 Buildout Year:2023 <br />AM PEAK HOUR <br />AM PHF = 0.82 <br />Description Left Through Right Left Through Right Left Through Right Left Through Right <br />2020 Traffic Count 346 1 2 0 0 0 0 142 13 74 77 0 <br />Count Balancing 0 0 0 0 0 0 0 0 0 0 0 0 <br />2020 Existing Traffic 346 1 2 0 0 0 0 142 13 74 77 0 <br />Growth Factor (0.02 per year)0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 <br />2023 Background Growth 21 0 0 0 0 0 0 9 1 5 5 0 <br />2023 Background Traffic 367 1 2 0 0 0 0 151 14 79 82 0 <br />Project Traffic <br />Buc-ee's Traffic w/ Reassignment 71 0 0 0 0 0 0 7 0 296 6 0 <br />Phase 2 Traffic <br />Percent Assignment Inbound 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% <br />Inbound Project Traffic 0 0 0 0 0 0 0 0 0 0 0 0 <br />Percent Assignment Outbound 0% 0% 0% 0% 0% 0% 0% 0% 0% 43% 0% 0% <br />Outbound Project Traffic 0 0 0 0 0 0 0 0 0 19 0 0 <br />Total External Site Traffic 0 0 0 0 0 0 0 0 0 19 0 0 <br />Pass-By Capture Reduction 0 0 0 0 0 0 0 0 0 0 0 0 <br />Pass-By Capture Assignment 0 0 0 0 0 0 0 0 0 0 0 0 <br />Total Pass-By Traffic 0 0 0 0 0 0 0 0 0 0 0 0 <br />Total Phase 2 Traffic 0 0 0 0 0 0 0 0 0 19 0 0 <br />Total Project Traffic 71 0 0 0 0 0 0 7 0 315 6 0 <br />2023 Buildout Total 438 1 2 0 0 0 0 158 14 394 88 0 <br />Percent Impact (Approach) <br />36.4% <br />PM PEAK HOUR <br />PM PHF = 0.80 <br />Description Left Through Right Left Through Right Left Through Right Left Through Right <br />2020 Traffic Count 269 0 0 0 0 0 0 52 4 26 156 0 <br />Count Balancing 0 0 0 0 0 0 0 0 0 0 0 0 <br />2020 Existing Traffic 269 0 0 0 0 0 0 52 4 26 156 0 <br />Growth Factor (0.02 per year)0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 <br />2023 Background Growth 16 0 0 0 0 0 0 3 0 2 10 0 <br />2023 Background Traffic 285 0 0 0 0 0 0 55 4 28 166 0 <br />Project Traffic <br />Buc-ee's Traffic w/ Reassignment 97 0 0 0 0 0 0 10 0 420 9 0 <br />Phase 2 Traffic <br />Percent Assignment Inbound 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% <br />Inbound Project Traffic 0 0 0 0 0 0 0 0 0 0 0 0 <br />Percent Assignment Outbound 0% 0% 0% 0% 0% 0% 0% 0% 0% 43% 0% 0% <br />Outbound Project Traffic 0 0 0 0 0 0 0 0 0 49 0 0 <br />Total External Site Traffic 0 0 0 0 0 0 0 0 0 49 0 0 <br />Pass-By Capture Reduction 0 0 0 0 0 0 0 0 0 0 0 0 <br />Pass-By Capture Assignment 3 0 0 0 0 0 0 0 0 2 0 0 <br />Total Pass-By Traffic 3 0 0 0 0 0 0 0 0 2 0 0 <br />Total Phase 2 Traffic 3 0 0 0 0 0 0 0 0 51 0 0 <br />Total Project Traffic 100 0 0 0 0 0 0 10 0 471 9 0 <br />2023 Buildout Total 385 0 0 0 0 0 0 65 4 499 175 0 <br />Percent Impact (Approach) <br />0.0% <br />k:\dur_ldev\013284003 west orange site\t10 - addendum 1 rev - trip gen & dist adjustment\phase 2\[phase2-adjustedtripgen&dist-west orange site - weekday - tia data.xls]int. #5 9/11/20 <br />I-40 EB Service Road US-70/I-40 Connector Road US-70/I-40 Connector Road <br />Eastbound Westbound Northbound Southbound <br />16.1%-4.1%66.6% <br />Overall Percent Impact <br />I-40 EB Service Road US-70/I-40 Connector Road US-70/I-40 Connector Road <br />Eastbound Westbound Northbound Southbound <br />0.0%-0.0%0.0% <br />Overall Percent Impact <br />764
The URL can be used to link to this page
Your browser does not support the video tag.