Orange County NC Website
Table 1 - Trip Generation <br />Total In Out <br />Total Project Gross Trips (Phase 1 + 2)3,367 1,723 1,644 <br />Phase 1 Gross Trips (with 10% Adjustment)2,697 1,376 1,321 <br />Net Increase Gross 670 347 323 <br />Total In Out <br />Total Project Gross Trips (Phase 1 + 2)3,367 1,723 1,644 <br />Total Project Internal Capture (Phase 1 + 2)364 182 182 <br />Phase 2 Pass-by Trips 143 75 68 <br />Total Project External Primary Trips (Phase 1 + 2)2,860 1,466 1,394 <br />Phase 1 Gross Trips (from May 2020 TIA)2,697 1,376 1,321 <br />Phase 2 Net Increase in New External Trips 163 90 73 <br />Buc-ee's - Internal Capture Calculations <br />Trip Generation Calculations <br />Gross Trip Calculations <br />Condition PM Peak Hour <br />Land Use PM Peak Hour <br /> Trip Generation <br />738