Orange County NC Website
AM Peak Hour <br />Total In Out Total In Out <br />Total Project Gross Trips (Phase 1 + 2)1,763 976 787 2,533 1,307 1,226 <br />Phase 1 Gross Trips (with 10% Adjustment)1,341 711 630 1,861 968 893 <br />Net Increase Gross 422 265 157 672 339 333 <br />AM Peak Hour <br />Total In Out Total In Out <br />Total Project Gross Trips (Phase 1 + 2)1,763 976 787 2,533 1,307 1,226 <br />Total Project Internal Capture (Phase 1 + 2)218 109 109 362 181 181 <br />Phase 2 Pass-by Trips 7 4 3 91 52 39 <br />Total Project External Primary Trips (Phase 1 + 2)1,538 863 675 2,080 1,074 1,006 <br />Phase 1 Gross Trips (with 10% Adjust)1,341 711 630 1,861 968 893 <br />Phase 2 Net Increase in New External Trips 197 152 45 219 106 113 <br />PM Peak Hour <br />Buc-ee's - Internal Capture Calculations <br />Trip Generation Calculations <br />Gross Trip Calculations <br />Condition PM Peak Hour <br />Land Use <br />736