Orange County NC Website
INTERSECTION ANALYSIS SHEET <br />Sat In Sat Out <br />Project:West Orange Site Net New Trips:1,376 1,321 <br />Location:Efland, NC Pass-By Trips:0 0 <br />Scenario:Saturday Peak Hour <br />Ct. Date 10/26/2019 <br />N/S Street:US-70/I-40 Connector Road Annual Growth Rate:2.0%Existing Year:2019 <br />E/W Street:Ben Johnston Road/Site Driveway Growth Factor:0.061208 Buildout Year:2022 <br />AM PEAK HOUR <br />AM PHF = 0.98 <br />Description Left Through Right Left Through Right Left Through Right Left Through Right <br />2019 Traffic Count 0 0 0 57 0 1 0 170 39 1 172 0 <br />Count Balancing 0 0 0 0 0 0 0 0 0 0 0 0 <br />2019 Existing Traffic 0 0 0 57 0 1 0 170 39 1 172 0 <br />Growth Factor (0.02 per year)0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 <br />2022 Background Growth 0 0 0 3 0 0 0 10 2 0 11 0 <br />2022 Background Traffic 0 0 0 60 0 1 0 180 41 1 183 0 <br />Project Traffic <br />Percent Assignment Inbound 0% 0% 0% 0% 1% 0% 52% 0% 0% 0% 0% 2% <br />Inbound Project Traffic 0 0 0 0 14 0 716 0 0 0 0 27 <br />Percent Assignment Outbound 2% 1% 48% 0% 0% 0% 0% 0% 0% 0% 0% 0% <br />Outbound Project Traffic 26 14 634 0 0 0 0 0 0 0 0 0 <br />Total External Site Traffic 26 14 634 0 14 0 716 0 0 0 0 27 <br />Total Project Traffic 26 14 634 0 14 0 716 0 0 0 0 27 <br />2022 Buildout Total 26 14 634 60 14 1 716 180 41 1 183 27 <br />Percent Impact (Approach) <br />75.4% <br />k:\dur_ldev\013284003 west orange site\t9 - addendum 1 - trip gen adjustment\phase 1\analysis\[phase1-adjustedtripgen-west orange site - saturday - tia data.xls]int. #7 9/4/20 <br />Overall Percent Impact <br />100.0%18.7%76.4%12.8% <br />Eastbound Westbound Northbound Southbound <br />Site Driveway Ben Johnston Road US-70/I-40 Connector Road US-70/I-40 Connector Road <br />731