Orange County NC Website
FIGURERELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC.THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPERNOT TO SCALE <br />ROAD <br />MT. WILLING CONNECTORUS-70/I-40ROAD <br />BEN JOHNSTON <br />AVENUE <br />FORREST <br />US-70 <br />[21] (0) 21 <br />[1] (0) 1 <br />[70] (0) 70 <br />[233] (19) 214 <br />[3] (0) 3 <br />54 (0) [54] <br />4 (0) [4]TRAFFIC CAPACITY ANALYSISEFLAND, NCWEST ORANGE SITE229 (19) [248]51 (0) [51]ON RAMP <br />ON RAM P <br />OFF RAMPOFF RAM <br />PON RAM P <br />O <br />FF <br />R <br />A <br />M <br />PON RAMP <br />I-40 WB <br />I-40 EB <br />I-40 EB SERVICE RD. <br />I-40 WB SERVICE RD. <br />5 (0) [5] <br />248 (0) [248] <br />99 (0) [99][49] (0) 49[66] (0) 66[4] (0) 4[65] (10) 55[91] (0) 91[16] (0) 16[0] (0) 0 <br />[0] (0) 0 <br />[759] (474) 285 <br />SITE <br />DRWY. <br />SITE <br />SI <br />TE DRWY.EAST RI/RO[59] (0) 59[351] (0) 351[503] (503) 03 (0) [3]317 (0) [317]0 (19) [19][268] (268) 00 (170) [170][40] (0) 40 <br />[137] (0) 137 <br />[12] (0) 12 <br />[13] (0) 13[390] (18) 372[124] (0) 12446 (0) [46]171 (19) [190]16 (0) [16][102] (0) 102[522] (18) 504171 (0) [171] <br />0 (152) [152] <br />594 (18) [612]203 (19) [222]227 (0) [227]31 (0) [31] <br />1 (242) <683> [926] <br />69 (213) [282][637] (290) 347[194] (194) 0163 (429) [592]317 (0) [317][429] (429) 0 <br />[9] (9) 0 <br />[18] (18) 0 <br />160 (0) [160] <br />0 (9) [9] <br />0 (0) [0] <br />344 (48) <683> [1075] <br />0 (387) [387]749 (0) [749]0 (48) [48]SITE DRWY.WEST RI/RO* <br />PROPOSED BUILD-OUT IMPROVEMENTS <br />NOTE: I-40 WB OFF-RAMP REMOVED WITH 28 (420) [448]166 (9) [175]OFF RAMP*5LEGEND <br />XX <br />(XX) <br /><XX> <br />BACKGROUND TRAFFIC <br />SITE TRAFFIC <br />[XX]TOTAL BUILD-OUT TRAFFIC <br />I-40 WB OFF-RAMP DIVERSION <br />PEAK HOUR TRAFFIC VOLUMESBUILD-OUT PMPROJECTED (PHASE 1) ADDENDUM #1 <br />708