Browse
Search
Planning Board - 110420 Attachment 1
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Attachment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:49:09 AM
Creation date
10/29/2020 10:32:12 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1075
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 8 <br />kimley-horn.com 300 Morris Street, Suite 200, Durham, NC 27701 919 682 3583 <br />Phase 2 <br />The following additional improvements were identified to accommodate projected Phase 2 site <br />traffic: <br />Mt. Willing Road – I-40 EB Ramps <br />· Install a traffic signal <br />US-70/I-40 Connector – I-40 EB Ramps <br />· If not implemented with signal installation in Phase 1 and determined to be necessary based <br />on future traffic volumes, modify the recommended traffic signal to provide permitted + <br />protected phasing for the southbound left-turn movement on US-70/I-40 Connector <br />Mt. Willing Road – Site Driveway <br />· Construct a full-movement site driveway, with one ingress lane and two egress lanes, on Mt. <br />Willing Road approximately 625 feet north of I-40 WB Ramps <br />· Construct a northbound right-turn lane on Mt. Willing Road with approximately 200 feet of <br />storage and appropriate tapers <br />Recommended roadway laneage for Phase 1 and Phase 2 is shown on Figure 10. <br />Based on the capacity analyses presented herein, all of the study intersections are expected to <br />operate acceptably in the Phase 1 and Phase 2 build-out traffic conditions. <br />Should you have any questions or comments, please do not hesitate to contact me at (919) 653- <br />5874 or earl.lewellyn@kimley-horn.com. <br />Appendices <br />Appendix A: Figures 1 – 10 <br />Appendix B: Phase 1 Trip Generation & Int. Spreadsheets <br />Appendix C: Phase 2 Trip Generation, Phase 1 Reassignment, & Phase 2 Int. Spreadsheets <br />Appendix D: Phase 1 Synchro and SimTraffic Outputs <br />Appendix E: Phase 1 Weaving Analysis Outputs <br />Appendix F: Phase 2 Synchro and SimTraffic Outputs <br />Appendix G: Phase 2 Weaving Analysis Outputs <br />701
The URL can be used to link to this page
Your browser does not support the video tag.