Browse
Search
Planning Board - 110420 Attachment 1
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Attachment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:49:09 AM
Creation date
10/29/2020 10:32:12 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1075
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 <br />kimley-horn.com 300 Morris Street, Suite 200, Durham, NC 27701 919 682 3583 <br />Table 3 <br />Level-of-Service Summary <br />Condition AM Peak Hour <br />LOS (Delay) <br />PM Peak Hour <br />LOS (Delay) <br />Saturday Peak Hour <br />LOS (Delay) <br />US-70/I-40 Connector & I-40 WB Ramps (Signalized by Project) <br />Build-out Traffic – Phase 1 B (15.3)C (25.8)C (21.7) <br />Build-out Traffic – Phase 2 B (13.8)C (24.3)B (18.9) <br />US-70/I-40 Connector & Ben Johnston Road/Site Driveway (Signalized by Project) <br />Build-out Traffic – Phase 1 B (18.0)C (21.3)B (13.0) <br />Build-out Traffic – Phase 2 B (15.1)C (20.9)B (14.6) <br />I-40 WB Service Road & East RI/RO Site Driveway (Unsignalized)* <br />Build-out Traffic – Phase 1 SB – A (2.4) SB – A (4.6) SB – A (5.0) <br />Build-out Traffic – Phase 2 SB – A (2.5)SB – A (3.5)SB – A (3.5) <br />I-40 WB Service Road & West RI/RO Site Driveway (Unsignalized)* <br />Build-out Traffic – Phase 1 SB – A (1.9) SB – A (9.6) SB – A (2.6) <br />Build-out Traffic – Phase 2 SB – A (2.0)SB – B (13.6)SB – A (1.4) <br />Mount Willing Road & Site Driveway (Unsignalized)* <br />Build-out Traffic – Phase 2 WB – C (18.0)WB – C (21.2)WB – B (10.2) <br />* Note: HCM methodology does not report an overall level of service for unsignalized intersections. The <br />SimTraffic level of service and delay for the worst side-street approach are reported for those intersections. <br />Weaving analyses (see Appendix) were performed for the weekday AM, PM and Saturday peak <br />hours for the projected build-out traffic conditions using Highway Capacity Software (HCS Version <br />7.8.5) to determine the operating conditions of the I-40 Service Road segments between Mt. <br />Willing Road and US-70/I-40 Connector. The peak hour weaving LOS and volume-to-capacity ratio <br />for the projected build-out conditions are shown below in Table 4. <br />698
The URL can be used to link to this page
Your browser does not support the video tag.