Browse
Search
Planning Board - 110420 Attachment 1
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Attachment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:49:09 AM
Creation date
10/29/2020 10:32:12 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1075
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 <br />kimley-horn.com 300 Morris Street, Suite 200, Durham, NC 27701 919 682 3583 <br />Figures 4 – 6 show the Phase 1 peak volumes at the study intersections, while Figures 7 – 9 <br />show the Phase 2 peak volumes at the study intersections. <br />Capacity Analysis <br />Capacity analyses were performed for the build-out conditions of each phase using Synchro and <br />SimTraffic Version 10 software, and reports are attached. It should be noted that this analysis <br />intentionally assumes signal cycle lengths that are longer than necessary at signals on the US- <br />70/I40 Connector as a means of modeling worst-case queues for storage length determinations. <br />As a result, actual delays and queues are expected to be better than presented in this analysis. <br />Table 3 summarizes the operation of the intersection for the projected build-out traffic conditions. <br />Table 3 <br />Level-of-Service Summary <br />Condition AM Peak Hour <br />LOS (Delay) <br />PM Peak Hour <br />LOS (Delay) <br />Saturday Peak Hour <br />LOS (Delay) <br />US-70 & Efland-Cedar Grove Road (Signalized) <br />Build-out Traffic – Phase 1 C (27.4)B (19.2)B (10.8) <br />Build-out Traffic – Phase 2 C (29.1)B (19.4)B (10.9) <br />Mt. Willing Road & Forrest Avenue (Unsignalized)* <br />Build-out Traffic – Phase 1 EB – B (14.7)WB – B (11.8) WB – A (7.2) <br />Build-out Traffic – Phase 2 EB – B (12.2)WB – B (10.2)WB – A (5.3) <br />Mt. Willing Road & I-40 WB Ramps (Signalized by Project) <br />Build-out Traffic – Phase 1 B (10.8)B (12.3)B (13.4) <br />Build-out Traffic – Phase 2 A (8.7)B (17.6)A (9.1) <br />Mt. Willing Road & I-40 EB Ramps <br />Build-out Traffic – <br />Phase 1 Unsignalized*EB – C (18.8)EB – A (6.4) EB – A (4.7) <br />Build-out Traffic – <br />Phase 2 with Signal C (25.1)C (20.9)C (23.8) <br />US-70/I-40 Connector & I-40 EB Ramps (Signalized by Project) <br />Build-out (2022) Traffic – Phase 1 C (33.0)D (35.9)D (46.8) <br />Build-out (2022) Traffic – Phase 2 <br />with PM+PT SBL Phasing C (28.7)C (23.9)C (21.2) <br />* Note: HCM methodology does not report an overall level of service for unsignalized intersections. The <br />SimTraffic level of service and delay for the worst side-street approach are reported for those intersections. <br />697
The URL can be used to link to this page
Your browser does not support the video tag.