Browse
Search
Planning Board - 110420 Attachment 1
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Attachment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:49:09 AM
Creation date
10/29/2020 10:32:12 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1075
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KIMLEY-HORN AND ASSOCIATES, INC <br />NC License #F-0102 <br />kimley-horn.com 300 Morris Street, Suite 200, Durham, NC 27701 919 682 3583 <br />MEMORANDUM <br />To:Mr. Chuck Edwards, P.E. <br />NCDOT District Engineer <br />From:Earl Lewellyn, P.E. <br />Kimley-Horn and Associates, Inc. <br />Date: September 11, 2020 <br />Subject: Buc-ee’s West Orange Site – Efland, NC – Traffic Impact Analysis Addendum #1 <br />Kimley-Horn has performed this addendum to the original Phase 1 [Buc-ee’s – West Orange <br />County TIA (Kimley-Horn, June 2020)] and Phase 2 [Buc-ee’s Phase 2 – West Orange County <br />TIA (Kimley-Horn, August 2020)] to address comments from the North Carolina Department of <br />Transportation (NCDOT) related to site trip generation. The site is proposed to be located generally <br />north of I-40 between Mt. Willing Road and the US-70/I-40 Connector in Efland, North Carolina. <br />As noted in the original traffic studies, Phase 1 of the development proposes a 120-pump gas <br />station with convenience store with access on the US-70/I-40 Connector and on the I-40 WB <br />Service Road. While specific land uses have not been identified at this time, Phase 2 is assumed <br />to include a 120-room hotel, 8,000 square feet (SF) of medical office space, 30,000 SF of specialty <br />retail space, a 3,500 SF drive-in bank, 12,000 SF of fast casual restaurant space, and 20,000 SF <br />of high-turnover sit-down restaurant space. In addition to access proposed as part of Phase 1, a <br />full-movement access is proposed on Mt. Willing Road with Phase 2. <br />This memorandum presents updated traffic analyses accounting for the trip generation adjustment <br />for both Phase 1 (Buc-ee’s store only) and Phase 2 (Buc-ee’s store plus additional commercial <br />development). Weekday AM and PM peak hours as well as the Saturday peak hour were analyzed <br />for each phase. <br />Existing and Background Traffic <br />Existing and projected Phase 1 background volumes were obtained from the original TIA and were <br />not modified for this addendum. <br />In the Buc-ee’s Phase 2 TIA, Phase 1 site traffic volumes were included in the analysis as <br />background traffic. Based on comments from NCDOT, for this addendum Phase 1 site traffic was <br />generated and distributed separated but included as overall project traffic in order to more-clearly <br />represent the combined impact of the development. <br />018960 <br />9/11/2020 <br />694
The URL can be used to link to this page
Your browser does not support the video tag.