Orange County NC Website
West Orange Site Background PM <br />10: I-40 EB Service Road & I-40 EB Exit Ramp 07/24/2020 <br />K:\DUR_LDEV\013284003 West Orange Site\T8 - Phase 2 TIA\T4 - Analysis\Synchro\Background PM.syn Synchro 10 Report <br />Kimley-Horn Page 21 <br />Lane Group EBL EBT WBT WBR SBL SBR <br />Lane Configurations <br />Traffic Volume (vph)0 270 0 0 649 0 <br />Future Volume (vph)0 270 0 0 649 0 <br />Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 <br />Satd. Flow (prot)0 1863 0 0 1770 0 <br />Flt Permitted 0.950 <br />Satd. Flow (perm)0 1863 0 0 1770 0 <br />Link Speed (mph)50 50 50 <br />Link Distance (ft)904 814 638 <br />Travel Time (s)12.3 11.1 8.7 <br />Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 <br />Shared Lane Traffic (%) <br />Lane Group Flow (vph)0 300 0 0 721 0 <br />Sign Control Free Stop Free <br />Intersection Summary <br />Area Type:Other <br />Control Type: Unsignalized <br />Intersection Capacity Utilization 56.8%ICU Level of Service B <br />Analysis Period (min) 15 <br />583