Orange County NC Website
West Orange Site Background PM <br />7: US-70/I-40 Connector Road & Site Driveway/Ben Johnston Road 07/24/2020 <br />K:\DUR_LDEV\013284003 West Orange Site\T8 - Phase 2 TIA\T4 - Analysis\Synchro\Background PM.syn Synchro 10 Report <br />Kimley-Horn Page 15 <br />Area Type:Other <br />Cycle Length: 120 <br />Actuated Cycle Length: 120 <br />Offset: 70 (58%), Referenced to phase 2:NBT and 6:SBTL, Start of Green <br />Natural Cycle: 50 <br />Control Type: Actuated-Coordinated <br />Maximum v/c Ratio: 0.67 <br />Intersection Signal Delay: 20.9 Intersection LOS: C <br />Intersection Capacity Utilization 55.5%ICU Level of Service B <br />Analysis Period (min) 15 <br />Splits and Phases: 7: US-70/I-40 Connector Road & Site Driveway/Ben Johnston Road <br />579