Orange County NC Website
West Orange Site Background AM <br />5: US-70/I-40 Connector Road & I-40 EB Service Road 07/24/2020 <br />K:\DUR_LDEV\013284003 West Orange Site\T8 - Phase 2 TIA\T4 - Analysis\Synchro\Background AM.syn Synchro 10 Report <br />Kimley-Horn Page 11 <br />Cycle Length: 120 <br />Actuated Cycle Length: 120 <br />Offset: 90 (75%), Referenced to phase 2:NBT and 6:SBTL, Start of Green <br />Natural Cycle: 60 <br />Control Type: Actuated-Coordinated <br />Maximum v/c Ratio: 0.78 <br />Intersection Signal Delay: 30.7 Intersection LOS: C <br />Intersection Capacity Utilization 64.3%ICU Level of Service C <br />Analysis Period (min) 15 <br />Splits and Phases: 5: US-70/I-40 Connector Road & I-40 EB Service Road <br />557