Orange County NC Website
West Orange Site Background AM <br />3: Mt. Willing Road & I-40 WB Entrance Ramp/I-40 WB Service Road 07/24/2020 <br />K:\DUR_LDEV\013284003 West Orange Site\T8 - Phase 2 TIA\T4 - Analysis\Synchro\Background AM.syn Synchro 10 Report <br />Kimley-Horn Page 6 <br />Cycle Length: 60 <br />Actuated Cycle Length: 60 <br />Offset: 58 (97%), Referenced to phase 2:NBTL and 6:SBT, Start of Green <br />Natural Cycle: 50 <br />Control Type: Actuated-Coordinated <br />Maximum v/c Ratio: 0.66 <br />Intersection Signal Delay: 10.5 Intersection LOS: B <br />Intersection Capacity Utilization 67.6%ICU Level of Service C <br />Analysis Period (min) 15 <br />m Volume for 95th percentile queue is metered by upstream signal. <br />Splits and Phases: 3: Mt. Willing Road & I-40 WB Entrance Ramp/I-40 WB Service Road <br />553