INTERSECTION ANALYSIS SHEET <br />AM In AM Out PM In PM Out <br />Project:Buc-ee's Phase 2 Net New Trips:152 45 106 113 <br />Location:Efland NC Pass-By Trips:4 3 52 39 <br />Scenario:Phase 2 Build-Out <br />Peak Hour:7:30 - 8:30 AM; 5:00 - 6:00 PM <br />Ct. Date 5/22/2019 <br />N/S Street:US-70/I-40 Connector Road Annual Growth Rate:2.0%Existing Year:2020 <br />E/W Street:Ben Johnston Road/Site Driveway Growth Factor:0.061208 Buildout Year:2023 <br />AM PEAK HOUR <br />AM PHF = 0.84 <br />Description Left Through Right Left Through Right Left Through Right Left Through Right <br />2020 Traffic Count 0 0 0 93 0 5 0 308 196 1 349 0 <br />Count Balancing 0 0 0 0 0 0 0 0 0 0 0 0 <br />2020 Existing Traffic 0 0 0 93 0 5 0 308 196 1 349 0 <br />Growth Factor (0.02 per year)0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 <br />2023 Background Growth 0 0 0 6 0 0 0 19 12 0 21 0 <br />Committed Projects <br />Buc-ee's Phase 1 11 6 275 0 6 0 336 0 0 0 0 13 <br />Total Committed Traffic 11 6 275 0 6 0 336 0 0 0 0 13 <br />2023 Background Traffic 11 6 275 99 6 5 336 327 208 1 370 13 <br />Project Traffic <br />Percent Assignment Inbound 0% 0% 0% 0% 2% 0% 43% 0% 0% 0% 0% 5% <br />Inbound Project Traffic 0 0 0 0 3 0 65 0 0 0 0 8 <br />Percent Assignment Outbound 5% 2% 43% 0% 0% 0% 0% 0% 0% 0% 0% 0% <br />Outbound Project Traffic 2 1 19 0 0 0 0 0 0 0 0 0 <br />Total External Site Traffic 2 1 19 0 3 0 65 0 0 0 0 8 <br />Total Project Traffic 2 1 21 0 3 0 67 0 0 0 0 8 <br />2023 Buildout Total 13 7 296 99 9 5 403 327 208 1 370 21 <br />Percent Impact (Approach) <br />5.8% <br />PM PEAK HOUR <br />PM PHF = 0.85 <br />Description Left Through Right Left Through Right Left Through Right Left Through Right <br />2020 Traffic Count 0 0 0 151 0 0 0 331 56 3 299 0 <br />Count Balancing 0 0 0 0 0 0 0 0 0 0 0 0 <br />2020 Existing Traffic 0 0 0 151 0 0 0 331 56 3 299 0 <br />Growth Factor (0.02 per year)0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 <br />2023 Background Growth 0 0 0 9 0 0 0 20 3 0 18 0 <br />Committed Projects <br />Buc-ee's Phase 1 16 8 390 0 8 0 458 0 0 0 0 18 <br />Total Committed Traffic 16 8 390 0 8 0 458 0 0 0 0 18 <br />2023 Background Traffic 16 8 390 160 8 0 458 351 59 3 317 18 <br />Project Traffic <br />Percent Assignment Inbound 0% 0% 0% 0% 2% 0% 43% 0% 0% 0% 0% 5% <br />Inbound Project Traffic 0 0 0 0 1 0 46 0 0 0 0 5 <br />Percent Assignment Outbound 5% 2% 43% 0% 0% 0% 0% 0% 0% 0% 0% 0% <br />Outbound Project Traffic 6 2 49 0 0 0 0 0 0 0 0 0 <br />Total External Site Traffic 6 2 49 0 1 0 46 0 0 0 0 5 <br />Total Project Traffic 8 2 69 0 1 0 72 -3 0 0 -3 8 <br />2023 Buildout Total 24 10 459 160 9 0 530 348 59 3 314 26 <br />Percent Impact (Approach) <br />7.9% <br />k:\dur_ldev\013284003 west orange site\t8 - phase 2 tia\t4 - analysis\[west orange site - phase 2 tia data - tripgen10.xls]int. #7 8/3/20 <br />Site Driveway Ben Johnston Road US-70/I-40 Connector Road US-70/I-40 Connector Road <br />Eastbound Westbound Northbound Southbound <br />7.6%2.7%7.1%2.0% <br />Overall Percent Impact <br />Site Driveway Ben Johnston Road US-70/I-40 Connector Road US-70/I-40 Connector Road <br />Eastbound Westbound Northbound Southbound <br />16.0%0.6%7.4%1.5% <br />Overall Percent Impact <br />514