Browse
Search
Planning Board - 110420 Attachment 1
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Attachment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:49:09 AM
Creation date
10/29/2020 10:32:12 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1075
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERSECTION ANALYSIS SHEET <br />AM In AM Out PM In PM Out <br />Project:Buc-ee's Phase 2 Net New Trips:152 45 106 113 <br />Location: Efland NC Pass-By Trips:4 3 52 39 <br />Scenario: Phase 2 Build-Out <br />Peak Hour: 7:30 - 8:30 AM; 5:00 - 6:00 PM <br />Ct. Date 5/22/2019 <br />N/S Street: US-70/I-40 Connector Road Annual Growth Rate:2.0%Existing Year:2020 <br />E/W Street: I-40 WB Exit Ramp Growth Factor:0.061208 Buildout Year:2023 <br />AM PEAK HOUR <br />AM PHF = 0.85 <br />Description Left Through Right Left Through Right Left Through Right Left Through Right <br />2020 Traffic Count 0 0 0 7 1 26 3 489 0 0 145 299 <br />Count Balancing 0 0 0 0 0 0 0 0 0 0 0 0 <br />2020 Existing Traffic 0 0 0 7 1 26 3 489 0 0 145 299 <br />Growth Factor (0.02 per year)0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 <br />2023 Background Growth 0 0 0 0 0 2 0 30 0 0 9 18 <br />Committed Projects <br />Buc-ee's Phase 1 0 0 0 0 162 142 129 194 0 0 275 0 <br />Total Committed Traffic 0 0 0 0 162 142 129 194 0 0 275 0 <br />I-40 WB Off-Ramp Closure Diversion 0 0 0 0 191 0 0 0 0 0 0 0 <br />2023 Background Traffic 0 0 0 7 354 170 132 713 0 0 429 317 <br />Project Traffic <br />Percent Assignment Inbound 0% 0% 0% 0% 0% 43% 0% 0% 0% 0% 0% 0% <br />Inbound Project Traffic 0 0 0 0 0 65 0 0 0 0 0 0 <br />Percent Assignment Outbound 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 43% 0% <br />Outbound Project Traffic 0 0 0 0 0 0 0 0 0 0 19 0 <br />Total External Site Traffic 0 0 0 0 0 65 0 0 0 0 19 0 <br />Total Project Traffic 0 0 0 0 0 67 0 0 0 0 19 1 <br />2023 Buildout Total 0 0 0 7 354 237 132 713 0 0 448 318 <br />Percent Impact (Approach) <br />3.9% <br />PM PEAK HOUR <br />PM PHF = 0.85 <br />Description Left Through Right Left Through Right Left Through Right Left Through Right <br />2020 Traffic Count 0 0 0 29 1 65 0 327 0 0 154 299 <br />Count Balancing 0 0 0 0 0 0 0 0 0 0 0 0 <br />2020 Existing Traffic 0 0 0 29 1 65 0 327 0 0 154 299 <br />Growth Factor (0.02 per year)0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 <br />2023 Background Growth 0 0 0 2 0 4 0 20 0 0 9 18 <br />Committed Projects <br />Buc-ee's Phase 1 0 0 0 0 220 194 176 264 0 0 390 0 <br />Total Committed Traffic 0 0 0 0 220 194 176 264 0 0 390 0 <br />I-40 WB Off-Ramp Closure Diversion 0 0 0 0 683 0 0 0 0 0 0 0 <br />2023 Background Traffic 0 0 0 31 904 263 176 611 0 0 553 317 <br />Project Traffic <br />Percent Assignment Inbound 0% 0% 0% 0% 0% 43% 0% 0% 0% 0% 0% 0% <br />Inbound Project Traffic 0 0 0 0 0 46 0 0 0 0 0 0 <br />Percent Assignment Outbound 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 43% 0% <br />Outbound Project Traffic 0 0 0 0 0 0 0 0 0 0 49 0 <br />Total External Site Traffic 0 0 0 0 0 46 0 0 0 0 49 0 <br />Total Project Traffic 0 0 0 0 0 67 0 3 0 0 51 18 <br />2023 Buildout Total 0 0 0 31 904 330 176 614 0 0 604 335 <br />Percent Impact (Approach) <br />4.6% <br />k:\dur_ldev\013284003 west orange site\t8 - phase 2 tia\t4 - analysis\[west orange site - phase 2 tia data - tripgen10.xls]int. #6 8/3/20 <br />I-40 WB Exit Ramp US-70/I-40 Connector Road US-70/I-40 Connector Road <br />Eastbound Westbound Northbound Southbound <br />-11.2%0.0%2.6% <br />Overall Percent Impact <br />I-40 WB Exit Ramp US-70/I-40 Connector Road US-70/I-40 Connector Road <br />Eastbound Westbound Northbound Southbound <br />-5.3%0.4%7.3% <br />Overall Percent Impact <br />513
The URL can be used to link to this page
Your browser does not support the video tag.