Browse
Search
Planning Board - 110420 Attachment 1
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Attachment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:49:09 AM
Creation date
10/29/2020 10:32:12 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1075
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERSECTION ANALYSIS SHEET <br />AM In AM Out PM In PM Out <br />Project:Buc-ee's Phase 2 Net New Trips:152 45 106 113 <br />Location:Efland NC Pass-By Trips:4 3 52 39 <br />Scenario:Phase 2 Build-Out <br />Peak Hour:7:15 - 8:15 AM; 5:00 - 6:00 PM <br />Ct. Date 5/21/2019 <br />N/S Street:Mt. Willing Road Annual Growth Rate:2.0%Existing Year:2020 <br />E/W Street:I-40 EB Exit Ramp Growth Factor:0.061208 Buildout Year:2023 <br />AM PEAK HOUR <br />AM PHF = 0.91 <br />Description Left Through Right Left Through Right Left Through Right Left Through Right <br />2020 Traffic Count 50 3 12 0 0 0 0 82 128 595 137 0 <br />Count Balancing 0 0 0 0 0 0 0 0 0 0 0 0 <br />2020 Existing Traffic 50 3 12 0 0 0 0 82 128 595 137 0 <br />Growth Factor (0.02 per year)0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 <br />2023 Background Growth 3 0 1 0 0 0 0 5 8 36 8 0 <br />Committed Projects <br />Buc-ee's Phase 1 0 0 0 0 0 0 0 0 0 13 0 0 <br />Total Committed Traffic 0 0 0 0 0 0 0 0 0 13 0 0 <br />2023 Background Traffic 53 3 13 0 0 0 0 87 136 644 145 0 <br />Project Traffic <br />Percent Assignment Inbound 42% 0% 0% 0% 0% 0% 0% 3% 0% 0% 0% 0% <br />Inbound Project Traffic 64 0 0 0 0 0 0 5 0 0 0 0 <br />Percent Assignment Outbound 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 3% 0% <br />Outbound Project Traffic 0 0 0 0 0 0 0 0 0 0 1 0 <br />Total External Site Traffic 64 0 0 0 0 0 0 5 0 0 1 0 <br />Total Project Traffic 65 0 0 0 0 0 0 5 0 1 1 0 <br />2023 Buildout Total 118 3 13 0 0 0 0 92 136 645 146 0 <br />Percent Impact (Approach) <br />6.2% <br />PM PEAK HOUR <br />PM PHF = 0.90 <br />Description Left Through Right Left Through Right Left Through Right Left Through Right <br />2020 Traffic Count 66 1 20 0 0 0 0 62 46 191 214 0 <br />Count Balancing 0 0 0 0 0 0 0 0 0 0 0 0 <br />2020 Existing Traffic 66 1 20 0 0 0 0 62 46 191 214 0 <br />Growth Factor (0.02 per year)0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 <br />2023 Background Growth 4 0 1 0 0 0 0 4 3 12 13 0 <br />Committed Projects <br />Buc-ee's Phase 1 0 0 0 0 0 0 0 0 0 18 0 0 <br />Total Committed Traffic 0 0 0 0 0 0 0 0 0 18 0 0 <br />2023 Background Traffic 70 1 21 0 0 0 0 66 49 221 227 0 <br />Project Traffic <br />Percent Assignment Inbound 42% 0% 0% 0% 0% 0% 0% 3% 0% 0% 0% 0% <br />Inbound Project Traffic 45 0 0 0 0 0 0 3 0 0 0 0 <br />Percent Assignment Outbound 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 3% 0% <br />Outbound Project Traffic 0 0 0 0 0 0 0 0 0 0 3 0 <br />Total External Site Traffic 45 0 0 0 0 0 0 3 0 0 3 0 <br />Total Project Traffic 63 3 0 0 0 0 0 3 0 15 3 0 <br />2023 Buildout Total 133 4 21 0 0 0 0 69 49 236 230 0 <br />Percent Impact (Approach) <br />11.7% <br />k:\dur_ldev\013284003 west orange site\t8 - phase 2 tia\t4 - analysis\[west orange site - phase 2 tia data - tripgen10.xls]int. #4 8/3/20 <br />I-40 EB Exit Ramp Mt. Willing Road Mt. Willing Road <br />Eastbound Westbound Northbound Southbound <br />48.5%-2.2%0.3% <br />Overall Percent Impact <br />I-40 EB Exit Ramp Mt. Willing Road Mt. Willing Road <br />Eastbound Westbound Northbound Southbound <br />41.8%-2.5%3.9% <br />Overall Percent Impact <br />511
The URL can be used to link to this page
Your browser does not support the video tag.