Browse
Search
Planning Board - 110420 Attachment 1
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Attachment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:49:09 AM
Creation date
10/29/2020 10:32:12 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1075
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERSECTION ANALYSIS SHEET <br />AM In AM Out PM In PM Out <br />Project:Buc-ee's Phase 2 Net New Trips:152 45 106 113 <br />Location:Efland NC Pass-By Trips:4 3 52 39 <br />Scenario:Phase 2 Build-Out <br />Peak Hour:7:15 - 8:15 AM; 5:00 - 6:00 PM <br />Ct. Date 5/23/2019 <br />N/S Street:Efland-Cedar Grove Road Annual Growth Rate:2.0%Existing Year:2020 <br />E/W Street:US-70 Growth Factor:0.061208 Buildout Year:2023 <br />AM PEAK HOUR <br />AM PHF = 0.84 <br />Description Left Through Right Left Through Right Left Through Right Left Through Right <br />2020 Traffic Count 10 261 151 5 98 41 57 114 7 141 428 17 <br />Count Balancing 0 0 0 0 0 0 0 0 0 0 0 0 <br />2020 Existing Traffic 10 261 151 5 98 41 57 114 7 141 428 17 <br />Growth Factor (0.02 per year)0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 <br />2023 Background Growth 1 16 9 0 6 3 3 7 0 9 26 1 <br />Committed Projects <br />Buc-ee's Phase 1 0 0 0 0 0 0 0 11 0 0 13 0 <br />Total Committed Traffic 0 0 0 0 0 0 0 11 0 0 13 0 <br />2023 Background Traffic 11 277 160 5 104 44 60 132 7 150 467 18 <br />Project Traffic <br />Percent Assignment Inbound 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0% <br />Inbound Project Traffic 0 0 0 0 0 0 0 0 0 0 8 0 <br />Percent Assignment Outbound 0% 0% 0% 0% 0% 0% 0% 5% 0% 0% 0% 0% <br />Outbound Project Traffic 0 0 0 0 0 0 0 2 0 0 0 0 <br />Total External Site Traffic 0 0 0 0 0 0 0 2 0 0 8 0 <br />Total Project Traffic 0 0 0 0 0 0 0 2 0 0 8 0 <br />2023 Buildout Total 11 277 160 5 104 44 60 134 7 150 475 18 <br />Percent Impact (Approach) <br />0.7% <br />PM PEAK HOUR <br />PM PHF = 0.95 <br />Description Left Through Right Left Through Right Left Through Right Left Through Right <br />2020 Traffic Count 11 129 38 5 234 93 117 351 12 43 161 15 <br />Count Balancing 0 0 0 0 0 0 0 0 0 0 0 0 <br />2020 Existing Traffic 11 129 38 5 234 93 117 351 12 43 161 15 <br />Growth Factor (0.02 per year)0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 <br />2023 Background Growth 1 8 2 0 14 6 7 21 1 3 10 1 <br />Committed Projects <br />Buc-ee's Phase 1 0 0 0 0 0 0 0 16 0 0 18 0 <br />Total Committed Traffic 0 0 0 0 0 0 0 16 0 0 18 0 <br />2023 Background Traffic 12 137 40 5 248 99 124 388 13 46 189 16 <br />Project Traffic <br />Percent Assignment Inbound 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 5% 0% <br />Inbound Project Traffic 0 0 0 0 0 0 0 0 0 0 5 0 <br />Percent Assignment Outbound 0% 0% 0% 0% 0% 0% 0% 5% 0% 0% 0% 0% <br />Outbound Project Traffic 0 0 0 0 0 0 0 6 0 0 0 0 <br />Total External Site Traffic 0 0 0 0 0 0 0 6 0 0 5 0 <br />Total Project Traffic 0 0 0 0 0 0 0 6 0 0 5 0 <br />2023 Buildout Total 12 137 40 5 248 99 124 394 13 46 194 16 <br />Percent Impact (Approach) <br />0.8% <br />k:\dur_ldev\013284003 west orange site\t8 - phase 2 tia\t4 - analysis\[west orange site - phase 2 tia data - tripgen10.xls]int. #1 8/3/20 <br />US-70 US-70 Efland-Cedar Grove Road Efland-Cedar Grove Road <br />Eastbound Westbound Northbound Southbound <br />0.0%0.0%1.0%1.2% <br />Overall Percent Impact <br />US-70 US-70 Efland-Cedar Grove Road Efland-Cedar Grove Road <br />Eastbound Westbound Northbound Southbound <br />0.0%0.0%1.1%2.0% <br />Overall Percent Impact <br />508
The URL can be used to link to this page
Your browser does not support the video tag.