Orange County NC Website
Buc-ee’s Phase 2 – Efland, NC <br /> <br />18 <br /> <br />6.1 US-70 – Efland-Cedar Grove Road <br /> <br />Analyses indicate that the signalized US-70 – Efland-Cedar Grove Road intersection currently <br />operates at LOS C in the AM peak hour and LOS B in the PM peak hour. With the addition of <br />background and site traffic, the intersection is expected to continue operating at LOS C in the AM <br />peak hour and LOS B in the PM peak hour. No queuing issues are expected at this intersection <br />based on SimTraffic simulations. <br /> <br />Based on the minor increase in intersection delay associated with the addition of site traffic, and <br />since no queuing issues are anticipated, no improvements are recommended at this intersection to <br />accommodate site traffic. <br /> <br />Table 6.1 summarizes the operation of the intersection for the existing (2020) and projected <br />(2023) background and build-out traffic conditions. <br /> <br />Table 6.1 <br />Level-of-Service <br />US-70 – Efland-Cedar Grove Road (Signalized) <br />Condition AM Peak Hour <br />LOS (Delay) <br />PM Peak Hour <br />LOS (Delay) <br />Existing (2020) Traffic C (23.9) B (15.9) <br />Background (2023) Traffic C (27.3) B (19.1) <br />Build-out (2023) Traffic C (27.7) B (19.3) <br />464