Browse
Search
Planning Board - 110420 Attachment 1
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Attachment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:49:09 AM
Creation date
10/29/2020 10:32:12 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1075
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Buc-ee’s Phase 2 – Efland, NC <br /> <br />1 <br /> <br />1.0 Introduction <br /> <br />Kimley-Horn and Associates, Inc. has performed a Traffic Impact Analysis for Phase 2 of the <br />proposed Buc-ee’s - West Orange County project located north of I-40 between Mt. Willing Road <br />and the US-70/I-40 Connector in Efland, North Carolina. As currently envisioned, phase 2 of the <br />project is assumed to add a 120-room hotel, 8,000 square feet (SF) of medical office space, <br />30,000 SF of specialty retail space, a 3,500 SF drive-in bank, 12,000 SF of fast casual restaurant <br />space, and 20,000 SF of high-turnover sit-down restaurant space. Project build-out is anticipated <br />in 2023. The project will be accessed via one full-movement driveway on the US-70/I-40 <br />Connector aligning with Ben Johnston Road, one full-movement site driveway on Mt. Willing <br />Road, and two right-in/right-out driveways along the I-40 WB Service Road. <br /> <br />This report presents trip generation, distribution, traffic analyses, and recommendations for <br />transportation improvements required to meet anticipated traffic demands in conjunction with the <br />development. The traffic conditions studied include the existing (2020) traffic condition as well <br />as the projected (2023) background and build-out traffic conditions. Note that I-40 and I-85 <br />routes overlap in the study area. Because the freeway’s east-west orientation through the study <br />area generally matches I-40’s overall alignment, this report refers to this roadway segment as I-40 <br />for clarity and consistency. <br /> <br />447
The URL can be used to link to this page
Your browser does not support the video tag.