Orange County NC Website
Buc-ee’s Phase 2 – Efland, NC <br /> <br />ES-4 <br /> <br /> Extend the existing channelized westbound right-turn lane on I-40 WB Ramp to provide a <br />continuous channelized westbound right-turn lane between West RI/RO Driveway and Mt. <br />Willing Road. <br /> Restripe the existing westbound shared left-turn lane on I-40 WB Ramp to provide an <br />exclusive through lane. <br /> Install a traffic signal. <br /> <br />US-70/I-40 Connector – I-40 EB Ramps <br /> Restripe the existing eastbound right turn lane and remove right turn channelization on the I- <br />40 EB Ramp to provide a continuous shared left/through/right-turn lane. <br /> Widen the I-40 EB Ramp to provide and exclusive eastbound left-turn lane with 400 feet of <br />storage and an appropriate taper. <br /> Extend the existing exclusive southbound left-turn lane on US-70/I-40 Connector to provide <br />400 feet of storage and an appropriate taper. <br /> Construct an additional northbound receiving lane on US-70/I-40 Connector. <br /> Install a traffic signal. <br />US-70/I-40 Connector – I-40 WB Ramps <br /> Restripe the existing westbound left-turn lane on I-40 WB Ramp to provide an exclusive <br />through lane <br /> Construct a westbound shared through/left-turn lane with 450 feet of storage and an <br />appropriate taper on I-40 WB Ramp <br /> Widen the I-40 WB Ramp to provide dual westbound right-turn lanes with 450 feet of storage <br />and appropriate tapers <br /> Construct a second receiving lane on I-40 WB ramp departure, extending to I-40 WB Service <br />Road <br /> Extend the existing northbound left-turn lane to provide a continuous left-turn lane and a <br />continuous through lane on the northbound approach of US-70/I-40 Connector <br /> Install a traffic signal <br /> <br />US-70/I-40 Connector – Ben Johnston Road/Site Driveway <br /> Construct a site driveway on US-70/I-40 Connector Road opposite Ben Johnston Road to <br />provide two ingress lanes, and three egress lanes: (a left-turn lane with a minimum 100 feet of <br />storage, a continuous through lane, and a right-turn lane with a minimum 250 feet of storage). <br /> Construct an exclusive westbound left-turn lane on Ben Johnston Road with 200 feet of <br />storage and an appropriate taper <br /> Restripe the existing lane on Ben Johnston Road to provide a continuous westbound shared <br />through/right-turn lane <br /> Construct dual northbound left-turn lanes with 300 feet of storage and appropriate tapers on <br />US-70/I-40 Connector <br /> Install a traffic signal. <br /> <br />442