Browse
Search
Planning Board - 110420 Attachment 1
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Attachment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:49:09 AM
Creation date
10/29/2020 10:32:12 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1075
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HCS7 Freeway Weaving Report <br />Project Information <br />Analyst Kimley-Horn Date 4/8/2020 <br />Agency Analysis Year 2022 <br />Jurisdiction Efland, NC Time Period Analyzed Build PM <br />Project Description West Orange Site: <br />I-40 Eastbound <br />Service Road <br />Unit United States <br />Customary <br />Geometric Data <br />Number of Lanes (N), ln 2 Segment Type Highway/CD <br />Roadway <br />Segment Length (Ls), ft 705 Number of Maneuver Lanes (NWL), ln 2 <br />Weaving Configuration One-Sided Ramp-to-Freeway Lane Changes (LCRF), lc 1 <br />Terrain Type Level Freeway-to-Ramp Lane Changes (LCFR), lc 1 <br />Percent Grade, %-Ramp-to-Ramp Lane Changes (LCRR), lc 0 <br />Interchange Density (ID), int/mi 0.00 Cross Weaving Managed Lane No <br />Adjustment Factors <br />Driver Population Mostly Unfamiliar Final Speed Adjustment Factor (SAF)0.913 <br />Weather Type Non-Severe Weather Final Capacity Adjustment Factor (CAF)0.898 <br />Incident Type No Incident Demand Adjustment Factor (DAF)1.000 <br />Demand and Capacity <br />FF RF RR FR <br />Demand Volume (Vi), veh/h 0 221 47 696 <br />Peak Hour Factor (PHF)0.90 0.90 0.90 0.90 <br />Total Trucks, %2.00 2.00 2.00 2.00 <br />Heavy Vehicle Adjustment Factor (fHV)0.980 0.966 0.966 0.969 <br />Flow Rate (vi), pc/h 0 254 54 798 <br />Weaving Flow Rate (vw), pc/h 1052 Freeway Max Capacity (cIFL), pc/h/ln 2200 <br />Non-Weaving Flow Rate (vNW), pc/h 54 Density-Based Capacity (cIWL), pc/h/ln 1217 <br />Total Flow Rate (v), pc/h 1106 Demand Flow-Based Capacity (cIW), pc/h 2524 <br />Volume Ratio (VR)0.951 Weaving Segment Capacity (cW), veh/h 2357 <br />Minimum Lane Change Rate (LCMIN), lc/h 1052 Adjusted Weaving Area Capacity, pc/h 2187 <br />Maximum Weaving Length (LMAX), ft 13556 Volume-to-Capacity Ratio (v/c)0.51 <br />Speed and Density <br />Non-Weaving Vehicle Index (INW)0 Average Weaving Speed (SW), mi/h 38.2 <br />Non-Weaving Lane Change Rate (LCNW), lc/h 8 Average Non-Weaving Speed (SNW), mi/h 35.4 <br />Weaving Lane Change Rate (LCW), lc/h 1083 Average Speed (S), mi/h 38.1 <br />Weaving Lane Change Rate (LCAll), lc/h 1091 Density (D), pc/mi/ln 14.5 <br />Weaving Intensity Factor (W)0.319 Level of Service (LOS)B <br />Copyright © 2020 University of Florida. All Rights Reserved.HCS™Freeways Version 7.8.5 Generated: 04/08/2020 14:52:10 <br />Scenario #5B -Build PM -I-40 EB.xuf <br />429
The URL can be used to link to this page
Your browser does not support the video tag.