Browse
Search
Planning Board - 110420 Attachment 1
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Attachment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:49:09 AM
Creation date
10/29/2020 10:32:12 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1075
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />35 NELSON MULLINS RILEY & SCARBOROUGH LLP <br /> For informational purposes only. Past success does not indicate the likelihood of success in any future legal representation. <br />US-70/I-40 Connector – Ben Johnston Road <br />x Convert Ben Johnston Road to a right-in/right-out configuration with one ingress lane and <br />one egress lane. <br /> <br />US-70/I-40 Connector –Site Driveway <br />x Construct a site driveway on US-70/I-40 Connector Road approximately 400 feet north of <br />Ben Johnston Road. The driveway should provide two ingress lanes and three egress lanes: a left- <br />turn lane with approximately 200 feet of storage, a continuous right-turn lane, and a right-turn lane <br />with approximately 300 feet of storage <br />x Construct dual northbound left-turn lanes, each with approximately 300 feet of storage and <br />appropriate tapers on US-70/I-40 Connector <br />x Install a traffic signal <br /> <br />I-40 WB Ramp – East RI/RO Site Driveway <br />x Construct the site driveway as a right-in/right-out access, with one ingress lane and one <br />egress lane. <br />x Remove the existing I-40 WB Exit Ramp (WB Exit 160) <br />x Widen the westbound I-40 WB Ramp to provide a continuous through lane and a <br />continuous shared through/right-turn lane on I-40 WB Service Road through this intersection, tying <br />into the existing two-lane cross section on the I-40 WB Service Road just west of the exiting WB <br />Exit 160 Ramp junction. <br /> <br />I-40 WB Ramp – West RI/RO Site Driveway <br />x Construct the site driveway as a right-in/right-out access, with one ingress lane and one <br />egress lane. <br />x Widen the I-40 WB Ramp to provide an exclusive right-turn lane with approximately 200 <br />feet of storage and an appropriate taper. <br /> <br />Mt. Willing Road <br />x Provide emergency access as shown on Sheet C2.2 of the Rezoning Plan. <br />x Reserve twenty feet (25’) of right-of-way along the western Project boundary with Mt. <br />Willing Road in support of future road improvements to Mt. Willing Road by others. <br /> <br /> <br />B. Improvements listed below shall be constructed as part of Phase II of the Project, concurrent with <br />site access (in its final condition) to Mt Willing Road. <br /> <br />Mt. Willing Road – Site Driveway <br />x Construct a full-movement site driveway, with one ingress lane and two egress lanes, on <br />Mt. Willing Road approximately 625 feet north of I-40 WB Ramps <br />x Construct a northbound right-turn lane on Mt. Willing Road with approximately 200 feet of <br />storage and appropriate tapers <br /> <br />39
The URL can be used to link to this page
Your browser does not support the video tag.