Browse
Search
Planning Board - 110420 Attachment 1
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Attachment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:49:09 AM
Creation date
10/29/2020 10:32:12 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1075
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />34 NELSON MULLINS RILEY & SCARBOROUGH LLP <br /> For informational purposes only. Past success does not indicate the likelihood of success in any future legal representation. <br />A. Off-street loading (loading berths) shall be provided at a minimum of one (1) space for each five <br />thousand (5,000) square feet of floor area, not to exceed three (3) berths. <br />B. A loading berth shall adhere to the following dimensional requirements: <br />1. A minimum width of twelve (12) feet, <br />2. A minimum depth of sixty (60) feet, and <br />3. A vertical clearance of sixteen (16) feet above finished grade of the space. <br /> <br />SECTION 3-5 TIA IMPROVEMENTS SUMMARY <br /> <br />A. Improvements listed below shall be constructed as part of Phase I of the Project. <br /> <br />Mt. Willing Road – I-40 WB Ramps <br />x Construct a westbound left-turn lane with approximately 280 feet of storage and an <br />appropriate taper on the I-40 WB Ramp. <br />x Extend the existing channelized westbound right-turn lane on I-40 WB Ramp to provide a <br />continuous westbound right-turn lane between West RI/RO Driveway and Mt. Willing Road. <br />x Restripe the existing westbound shared left-turn lane on I-40 WB Ramp to provide an <br />exclusive through lane. <br />x Install a traffic signal. <br /> <br />US-70/I-40 Connector – I-40 EB Ramps <br />x Restripe the existing eastbound right turn lane and remove right turn channelization on the <br />I-40 EB Ramp to provide a continuous shared left/through/right-turn lane. <br />x Widen the I-40 EB Ramp to provide and exclusive eastbound left-turn lane with <br />approximately 400 feet of storage and an appropriate taper. <br />x Extend the existing exclusive southbound left-turn lane on US-70/I-40 Connector to provide <br />approximately 400 feet of storage and an appropriate taper. <br />x Construct an additional northbound receiving lane on US-70/I-40 Connector. <br />x Install a traffic signal. <br />US-70/I-40 Connector – I-40 WB Ramps <br />x Restripe the existing westbound left-turn lane on I-40 WB Ramp to provide an exclusive <br />through lane <br />x Construct a westbound shared through/left-turn lane with approximately 450 feet of storage <br />and an appropriate taper on I-40 WB Ramp <br />x Widen the I-40 WB Ramp to provide dual westbound right-turn lanes with approximately <br />450 feet of storage and appropriate tapers <br />x Construct a second receiving lane on I-40 WB ramp departure, extending to I-40 WB <br />Service Road <br />x Extend the existing northbound left-turn lane to provide a continuous left-turn lane and a <br />continuous through lane on the northbound approach of US-70/I-40 Connector <br />x Install a traffic signal <br /> <br />38
The URL can be used to link to this page
Your browser does not support the video tag.