Orange County NC Website
<br /> <br /> <br />34 NELSON MULLINS RILEY & SCARBOROUGH LLP <br /> For informational purposes only. Past success does not indicate the likelihood of success in any future legal representation. <br />A. Off-street loading (loading berths) shall be provided at a minimum of one (1) space for each five <br />thousand (5,000) square feet of floor area, not to exceed three (3) berths. <br />B. A loading berth shall adhere to the following dimensional requirements: <br />1. A minimum width of twelve (12) feet, <br />2. A minimum depth of sixty (60) feet, and <br />3. A vertical clearance of sixteen (16) feet above finished grade of the space. <br /> <br />SECTION 3-5 TIA IMPROVEMENTS SUMMARY <br /> <br />A. Improvements listed below shall be constructed as part of Phase I of the Project. <br /> <br />Mt. Willing Road – I-40 WB Ramps <br />x Construct a westbound left-turn lane with approximately 280 feet of storage and an <br />appropriate taper on the I-40 WB Ramp. <br />x Extend the existing channelized westbound right-turn lane on I-40 WB Ramp to provide a <br />continuous westbound right-turn lane between West RI/RO Driveway and Mt. Willing Road. <br />x Restripe the existing westbound shared left-turn lane on I-40 WB Ramp to provide an <br />exclusive through lane. <br />x Install a traffic signal. <br /> <br />US-70/I-40 Connector – I-40 EB Ramps <br />x Restripe the existing eastbound right turn lane and remove right turn channelization on the <br />I-40 EB Ramp to provide a continuous shared left/through/right-turn lane. <br />x Widen the I-40 EB Ramp to provide and exclusive eastbound left-turn lane with <br />approximately 400 feet of storage and an appropriate taper. <br />x Extend the existing exclusive southbound left-turn lane on US-70/I-40 Connector to provide <br />approximately 400 feet of storage and an appropriate taper. <br />x Construct an additional northbound receiving lane on US-70/I-40 Connector. <br />x Install a traffic signal. <br />US-70/I-40 Connector – I-40 WB Ramps <br />x Restripe the existing westbound left-turn lane on I-40 WB Ramp to provide an exclusive <br />through lane <br />x Construct a westbound shared through/left-turn lane with approximately 450 feet of storage <br />and an appropriate taper on I-40 WB Ramp <br />x Widen the I-40 WB Ramp to provide dual westbound right-turn lanes with approximately <br />450 feet of storage and appropriate tapers <br />x Construct a second receiving lane on I-40 WB ramp departure, extending to I-40 WB <br />Service Road <br />x Extend the existing northbound left-turn lane to provide a continuous left-turn lane and a <br />continuous through lane on the northbound approach of US-70/I-40 Connector <br />x Install a traffic signal <br /> <br />38