Orange County NC Website
West Orange Site Build PM <br />4: Mt. Willing Road & I-40 EB Exit Ramp/I-40 EB Service Road 06/09/2020 <br />K:\DUR_LDEV\013284003 West Orange Site\T4 - Analysis\Synchro\Build PM.syn Synchro 10 Report <br />Kimley-Horn Page 9 <br />Intersection <br />Int Delay, s/veh 5.6 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 70 4 21 0 0 0 0 66 49 221 227 0 <br />Future Vol, veh/h 70 4 21 0 0 0 0 66 49 221 227 0 <br />Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 <br />Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free <br />RT Channelized -- Yield -- None - - None - - None <br />Storage Length - - 135 - - - - - 80 225 - - <br />Veh in Median Storage, # - 0 - - 16979 - - 0 - - 0 - <br />Grade, %- 0 - - 0 - - 0 - - 0 - <br />Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 <br />Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 <br />Mvmt Flow 78 4 23 0 0 0 0 73 54 246 252 0 <br />Major/Minor Minor2 Major1 Major2 <br />Conflicting Flow All 844 871 252 - 0 0 127 0 0 <br /> Stage 1 744 744 -- - - - - - <br /> Stage 2 100 127 -- - - - - - <br />Critical Hdwy 6.42 6.52 6.22 - - - 4.12 - - <br />Critical Hdwy Stg 1 5.42 5.52 -- - - - - - <br />Critical Hdwy Stg 2 5.42 5.52 -- - - - - - <br />Follow-up Hdwy 3.518 4.018 3.318 - - - 2.218 - - <br />Pot Cap-1 Maneuver 334 289 787 0 - - 1459 - 0 <br /> Stage 1 470 421 -0 - - - - 0 <br /> Stage 2 924 791 -0 - - - - 0 <br />Platoon blocked, %- - - <br />Mov Cap-1 Maneuver 278 0 787 - - - 1459 - - <br />Mov Cap-2 Maneuver 278 0 -- - - - - - <br /> Stage 1 470 0 -- - - - - - <br /> Stage 2 768 0 -- - - - - - <br />Approach EB NB SB <br />HCM Control Delay, s 20.3 0 3.9 <br />HCM LOS C <br />Minor Lane/Major Mvmt NBT NBREBLn1EBLn2 SBL SBT <br />Capacity (veh/h)- - 278 787 1459 - <br />HCM Lane V/C Ratio -- 0.296 0.03 0.168 - <br />HCM Control Delay (s) - - 23.3 9.7 8 - <br />HCM Lane LOS - - C A A - <br />HCM 95th %tile Q(veh) -- 1.2 0.1 0.6 - <br />332