Browse
Search
Planning Board - 110420 Attachment 1
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Attachment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:49:09 AM
Creation date
10/29/2020 10:32:12 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1075
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Orange Site Build AM <br />7: US-70/I-40 Connector Road & Site Driveway/Ben Johnston Road 06/09/2020 <br />K:\DUR_LDEV\013284003 West Orange Site\T4 - Analysis\Synchro\Build AM.syn Synchro 10 Report <br />Kimley-Horn Page 15 <br />Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Control Delay 42.5 41.5 9.9 58.5 30.5 31.7 4.9 16.0 14.8 <br />Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br />Total Delay 42.5 41.5 9.9 58.5 30.5 31.7 4.9 16.0 14.8 <br />LOS D D A E C C A B B <br />Approach Delay 11.8 55.5 15.2 14.8 <br />Approach LOS B E B B <br />Queue Length 50th (ft) 8 5 51 81 5 109 87 1 82 <br />Queue Length 95th (ft) 25 18 105 134 23 152 98 8 138 <br />Internal Link Dist (ft)620 759 375 736 <br />Turn Bay Length (ft) 425 200 300 140 <br />Base Capacity (vph)379 506 862 374 466 972 2642 446 1974 <br />Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 <br />Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 <br />Storage Cap Reductn 0 0 0 0 0 0 0 0 0 <br />Reduced v/c Ratio 0.03 0.01 0.35 0.29 0.03 0.38 0.22 0.01 0.22 <br />Intersection Summary <br />Area Type:Other <br />Cycle Length: 120 <br />Actuated Cycle Length: 120 <br />Offset: 12 (10%), Referenced to phase 2:NBT and 6:SBTL, Start of Green <br />Natural Cycle: 50 <br />Control Type: Actuated-Coordinated <br />Maximum v/c Ratio: 0.62 <br />Intersection Signal Delay: 17.2 Intersection LOS: B <br />Intersection Capacity Utilization 50.4%ICU Level of Service A <br />Analysis Period (min) 15 <br />Splits and Phases: 7: US-70/I-40 Connector Road & Site Driveway/Ben Johnston Road <br />320
The URL can be used to link to this page
Your browser does not support the video tag.