Orange County NC Website
West Orange Site Background Saturday <br />7: US-70/I-40 Connector Road & Ben Johnston Road 04/15/2020 <br />K:\DUR_LDEV\013284003 West Orange Site\T4 - Analysis\Synchro\Background Saturday.syn Synchro 10 Report <br />Kimley-Horn Page 19 <br />Intersection <br />Int Delay, s/veh 1.7 <br />Movement WBL WBR NBT NBR SBL SBT <br />Lane Configurations <br />Traffic Vol, veh/h 60 4 180 41 4 183 <br />Future Vol, veh/h 60 4 180 41 4 183 <br />Conflicting Peds, #/hr 0 0 0 0 0 0 <br />Sign Control Stop Stop Free Free Free Free <br />RT Channelized - None - None - None <br />Storage Length 0 - - - 140 - <br />Veh in Median Storage, # 0 - 0 - - 0 <br />Grade, %0 - 0 - - 0 <br />Peak Hour Factor 90 98 98 90 98 98 <br />Heavy Vehicles, % 2 2 2 2 2 2 <br />Mvmt Flow 67 4 184 46 4 187 <br />Major/Minor Minor1 Major1 Major2 <br />Conflicting Flow All 309 115 0 0 230 0 <br /> Stage 1 207 - - - - - <br /> Stage 2 102 - - - - - <br />Critical Hdwy 6.84 6.94 - - 4.14 - <br />Critical Hdwy Stg 1 5.84 - - - - - <br />Critical Hdwy Stg 2 5.84 - - - - - <br />Follow-up Hdwy 3.52 3.32 - - 2.22 - <br />Pot Cap-1 Maneuver 659 916 - - 1335 - <br /> Stage 1 807 - - - - - <br /> Stage 2 911 - - - - - <br />Platoon blocked, %- - - <br />Mov Cap-1 Maneuver 657 916 -- 1335 - <br />Mov Cap-2 Maneuver 657 - - - - - <br /> Stage 1 807 - - - - - <br /> Stage 2 908 - - - - - <br />Approach WB NB SB <br />HCM Control Delay, s 11 0 0.2 <br />HCM LOS B <br />Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT <br />Capacity (veh/h)- - 668 1335 - <br />HCM Lane V/C Ratio -- 0.106 0.003 - <br />HCM Control Delay (s) - - 11 7.7 - <br />HCM Lane LOS - - B A - <br />HCM 95th %tile Q(veh) -- 0.4 0 - <br />305