Browse
Search
Planning Board - 110420 Attachment 1
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Attachment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:49:09 AM
Creation date
10/29/2020 10:32:12 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1075
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Orange Site Background AM <br />1: Efland-Cedar Grove Road & US-70 04/15/2020 <br />K:\DUR_LDEV\013284003 West Orange Site\T4 - Analysis\Synchro\Background AM.syn Synchro 10 Report <br />Kimley-Horn Page 2 <br />Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Yellow Time (s)4.6 4.6 4.6 4.6 5.2 5.2 5.2 5.2 <br />All-Red Time (s)1.1 1.1 1.1 1.1 1.0 1.0 1.0 1.0 <br />Lost Time Adjust (s)-0.7 -0.7 -1.2 -1.2 <br />Total Lost Time (s)5.0 5.0 5.0 5.0 <br />Lead/Lag <br />Lead-Lag Optimize? <br />Recall Mode Min Min Min Min None None None None <br />Act Effct Green (s)23.8 23.8 40.4 40.4 <br />Actuated g/C Ratio 0.32 0.32 0.54 0.54 <br />v/c Ratio 0.84 0.30 0.28 0.80 <br />Control Delay 34.2 16.1 12.2 25.3 <br />Queue Delay 0.0 0.0 0.0 0.0 <br />Total Delay 34.2 16.1 12.2 25.3 <br />LOS C B B C <br />Approach Delay 34.2 16.1 12.2 25.3 <br />Approach LOS C B B C <br />Queue Length 50th (ft)192 47 47 237 <br />Queue Length 95th (ft)300 90 119 #581 <br />Internal Link Dist (ft)786 879 365 881 <br />Turn Bay Length (ft) <br />Base Capacity (vph)1220 1193 744 860 <br />Starvation Cap Reductn 0 0 0 0 <br />Spillback Cap Reductn 0 0 0 0 <br />Storage Cap Reductn 0 0 0 0 <br />Reduced v/c Ratio 0.41 0.14 0.28 0.80 <br />Intersection Summary <br />Area Type:Other <br />Cycle Length: 100 <br />Actuated Cycle Length: 74.3 <br />Natural Cycle: 65 <br />Control Type: Actuated-Uncoordinated <br />Maximum v/c Ratio: 0.84 <br />Intersection Signal Delay: 25.4 Intersection LOS: C <br />Intersection Capacity Utilization 77.7%ICU Level of Service D <br />Analysis Period (min) 15 <br />Description: 07-1686 <br /># 95th percentile volume exceeds capacity, queue may be longer. <br /> Queue shown is maximum after two cycles. <br />Splits and Phases: 1: Efland-Cedar Grove Road & US-70 <br />265
The URL can be used to link to this page
Your browser does not support the video tag.