Orange County NC Website
West Orange Site Existing PM <br />5: US-70/I-40 Connector Road & I-40 EB Service Road 04/15/2020 <br />K:\DUR_LDEV\013284003 West Orange Site\T4 - Analysis\Synchro\Existing PM.syn Synchro 10 Report <br />Kimley-Horn Page 13 <br />Intersection <br />Int Delay, s/veh 8 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 269 4 4 0 0 0 0 52 4 26 156 0 <br />Future Vol, veh/h 269 4 4 0 0 0 0 52 4 26 156 0 <br />Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 <br />Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free <br />RT Channelized - - Stop - - None -- Yield -- None <br />Storage Length - - 125 - - - - - 40 250 - - <br />Veh in Median Storage, # - 0 - - 16979 - - 0 - - 0 - <br />Grade, %- 0 - - 0 - - 0 - - 0 - <br />Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 <br />Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 <br />Mvmt Flow 299 4 4 0 0 0 0 58 4 29 173 0 <br />Major/Minor Minor2 Major1 Major2 <br />Conflicting Flow All 289 289 173 - 0 0 58 0 0 <br /> Stage 1 231 231 -- - - - - - <br /> Stage 2 58 58 -- - - - - - <br />Critical Hdwy 6.42 6.52 6.22 - - - 4.12 - - <br />Critical Hdwy Stg 1 5.42 5.52 -- - - - - - <br />Critical Hdwy Stg 2 5.42 5.52 -- - - - - - <br />Follow-up Hdwy 3.518 4.018 3.318 - - - 2.218 - - <br />Pot Cap-1 Maneuver 702 621 871 0 - - 1546 - 0 <br /> Stage 1 807 713 -0 - - - - 0 <br /> Stage 2 965 847 -0 - - - - 0 <br />Platoon blocked, %- - - <br />Mov Cap-1 Maneuver 689 0 871 - - - 1546 - - <br />Mov Cap-2 Maneuver 689 0 -- - - - - - <br /> Stage 1 807 0 -- - - - - - <br /> Stage 2 947 0 -- - - - - - <br />Approach EB NB SB <br />HCM Control Delay, s 14.2 0 1.1 <br />HCM LOS B <br />Minor Lane/Major Mvmt NBT NBREBLn1EBLn2 SBL SBT <br />Capacity (veh/h)- - 689 871 1546 - <br />HCM Lane V/C Ratio -- 0.44 0.005 0.019 - <br />HCM Control Delay (s) - - 14.3 9.2 7.4 - <br />HCM Lane LOS - - B A A - <br />HCM 95th %tile Q(veh) -- 2.3 0 0.1 - <br />244