Orange County NC Website
West Orange Site Existing AM <br />5: US-70/I-40 Connector Road & I-40 EB Service Road 04/15/2020 <br />K:\DUR_LDEV\013284003 West Orange Site\T4 - Analysis\Synchro\Existing AM.syn Synchro 10 Report <br />Kimley-Horn Page 13 <br />Intersection <br />Int Delay, s/veh 13.8 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 346 4 4 0 0 0 0 142 13 74 77 0 <br />Future Vol, veh/h 346 4 4 0 0 0 0 142 13 74 77 0 <br />Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 <br />Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free <br />RT Channelized - - Stop - - None -- Yield -- None <br />Storage Length - - 125 - - - - - 40 250 - - <br />Veh in Median Storage, # - 0 - - 16979 - - 0 - - 0 - <br />Grade, %- 0 - - 0 - - 0 - - 0 - <br />Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 <br />Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 <br />Mvmt Flow 384 4 4 0 0 0 0 158 14 82 86 0 <br />Major/Minor Minor2 Major1 Major2 <br />Conflicting Flow All 408 408 86 - 0 0 158 0 0 <br /> Stage 1 250 250 -- - - - - - <br /> Stage 2 158 158 -- - - - - - <br />Critical Hdwy 6.42 6.52 6.22 - - - 4.12 - - <br />Critical Hdwy Stg 1 5.42 5.52 -- - - - - - <br />Critical Hdwy Stg 2 5.42 5.52 -- - - - - - <br />Follow-up Hdwy 3.518 4.018 3.318 - - - 2.218 - - <br />Pot Cap-1 Maneuver 599 533 973 0 - - 1422 - 0 <br /> Stage 1 792 700 -0 - - - - 0 <br /> Stage 2 871 767 -0 - - - - 0 <br />Platoon blocked, %- - - <br />Mov Cap-1 Maneuver 564 0 973 - - - 1422 - - <br />Mov Cap-2 Maneuver 564 0 -- - - - - - <br /> Stage 1 792 0 -- - - - - - <br /> Stage 2 820 0 -- - - - - - <br />Approach EB NB SB <br />HCM Control Delay, s 24.2 0 3.8 <br />HCM LOS C <br />Minor Lane/Major Mvmt NBT NBREBLn1EBLn2 SBL SBT <br />Capacity (veh/h)- - 564 973 1422 - <br />HCM Lane V/C Ratio -- 0.69 0.005 0.058 - <br />HCM Control Delay (s) - - 24.4 8.7 7.7 - <br />HCM Lane LOS - - C A A - <br />HCM 95th %tile Q(veh) -- 5.4 0 0.2 - <br />230