Orange County NC Website
INTERSECTION ANALYSIS SHEET <br />Sat In Sat Out <br />Project:West Orange Site Net New Trips:1,251 1,201 <br />Location:Efland, NC Pass-By Trips:0 0 <br />Scenario:Saturday Peak Hour <br />Peak Hour: 11:15 AM - 12:15 PM <br />Ct. Date 10/26/2019 <br />N/S Street: I-40 EB Entrance Ramp Annual Growth Rate:2.0%Existing Year:2019 <br />E/W Street: I-40 EB Service Road Growth Factor:0.061208 Buildout Year:2022 <br />AM PEAK HOUR <br />AM PHF = 0.90 <br />Description Left Through Right Left Through Right Left Through Right Left Through Right <br />2019 Traffic Count 275 0 169 0 0 0 0 0 0 0 0 0 <br />Count Balancing 0 0 0 0 0 0 0 0 0 0 0 0 <br />2019 Existing Traffic 275 0 169 0 0 0 0 0 0 0 0 0 <br />Growth Factor (0.02 per year)0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 <br />2022 Background Growth 17 0 10 0 0 0 0 0 0 0 0 0 <br />2022 Background Traffic 292 0 179 0 0 0 0 0 0 0 0 0 <br />Project Traffic <br />Percent Assignment Inbound 0% 0% 49% 0% 0% 0% 0% 0% 0% 0% 0% 0% <br />Inbound Project Traffic 0 0 613 0 0 0 0 0 0 0 0 0 <br />Percent Assignment Outbound 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% <br />Outbound Project Traffic 0 0 0 0 0 0 0 0 0 0 0 0 <br />Total External Site Traffic 0 0 613 0 0 0 0 0 0 0 0 0 <br />Total Project Traffic 0 0 613 0 0 0 0 0 0 0 0 0 <br />2022 Buildout Total 292 0 792 0 0 0 0 0 0 0 0 0 <br />Percent Impact (Approach) <br />56.5% <br />k:\dur_ldev\013284003 west orange site\t4 - analysis\[west orange site - saturday - tia data.xls]int. #11 4/23/20 <br />Overall Percent Impact <br />56.5%--- <br />Eastbound Westbound Northbound Southbound <br />I-40 EB Service Road <br />217