Orange County NC Website
INTERSECTION ANALYSIS SHEET <br />Sat In Sat Out <br />Project:West Orange Site Net New Trips:1,251 1,201 <br />Location:Efland, NC Pass-By Trips:0 0 <br />Scenario:Saturday Peak Hour <br />Peak Hour: <br />Ct. Date Balanced with I-40 WB Service Road (Int. #7) <br />N/S Street:West RI/RO Site Driveway Annual Growth Rate:2.0%Existing Year:2019 <br />E/W Street:I-40 WB Service Road Growth Factor:0.061208 Buildout Year:2022 <br />AM PEAK HOUR <br />AM PHF = 0.90 <br />Description Left Through Right Left Through Right Left Through Right Left Through Right <br />2019 Traffic Count 0 0 0 0 0 0 0 0 0 0 0 0 <br />Count Balancing 0 0 0 0 236 0 0 0 0 0 0 0 <br />2019 Existing Traffic 0 0 0 0 236 0 0 0 0 0 0 0 <br />Growth Factor (0.02 per year)0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 <br />2022 Background Growth 0 0 0 0 14 0 0 0 0 0 0 0 <br />2022 Background Traffic 0 0 0 0 250 0 0 0 0 0 0 0 <br />Project Traffic <br />Percent Assignment Inbound 0% 0% 0% 0% 0% 5% 0% 0% 0% 0% 0% 0% <br />Inbound Project Traffic 0 0 0 0 0 63 0 0 0 0 0 0 <br />Percent Assignment Outbound 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 34% <br />Outbound Project Traffic 0 0 0 0 0 0 0 0 0 0 0 408 <br />Total External Site Traffic 0 0 0 0 0 63 0 0 0 0 0 408 <br />Total Project Traffic 0 0 0 0 0 63 0 0 0 0 0 408 <br />2022 Buildout Total 0 0 0 0 250 63 0 0 0 0 0 408 <br />Percent Impact (Approach) <br />65.3% <br />k:\dur_ldev\013284003 west orange site\t4 - analysis\[west orange site - saturday - tia data.xls]int. #9 4/23/20 <br />I-40 WB Service Road West RI/RO Site Driveway <br />Eastbound Westbound Northbound Southbound <br />-20.1%-100.0% <br />Overall Percent Impact <br />215