Browse
Search
Planning Board - 110420 Attachment 1
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Attachment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:49:09 AM
Creation date
10/29/2020 10:32:12 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1075
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERSECTION ANALYSIS SHEET <br />Sat In Sat Out <br />Project:West Orange Site Net New Trips:1,251 1,201 <br />Location: Efland, NC Pass-By Trips:0 0 <br />Scenario: Saturday Peak Hour <br />Peak Hour: 11:00 AM - 12:00 PM <br />Ct. Date 10/26/2019 <br />N/S Street: US-70/I-40 Connector Road Annual Growth Rate:2.0%Existing Year:2019 <br />E/W Street: I-40 WB Exit Ramp Growth Factor:0.061208 Buildout Year:2022 <br />AM PEAK HOUR <br />AM PHF = 0.96 <br />Description Left Through Right Left Through Right Left Through Right Left Through Right <br />2019 Traffic Count 0 0 0 7 4 18 2 190 0 0 33 197 <br />Count Balancing 0 0 0 0 0 0 0 0 0 0 0 0 <br />2019 Existing Traffic 0 0 0 7 4 18 2 190 0 0 33 197 <br />Growth Factor (0.02 per year)0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 <br />2022 Background Growth 0 0 0 0 0 1 0 12 0 0 2 12 <br />2022 Background Traffic 0 0 0 7 4 19 2 202 0 0 35 209 <br />I-40 WB Off-Ramp Closure Diversion 0 0 0 0 220 0 0 0 0 0 0 0 <br />Project Traffic <br />Percent Assignment Inbound 0% 0% 0% 0% 25% 22% 20% 30% 0% 0% 0% 0% <br />Inbound Project Traffic 0 0 0 0 313 275 250 375 0 0 0 0 <br />Percent Assignment Outbound 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 48% 0% <br />Outbound Project Traffic 0 0 0 0 0 0 0 0 0 0 576 0 <br />Total External Site Traffic 0 0 0 0 313 275 250 375 0 0 576 0 <br />Total Project Traffic 0 0 0 0 313 275 250 375 0 0 576 0 <br />2022 Buildout Total 0 0 0 7 537 294 252 577 0 0 611 209 <br />Percent Impact (Approach) <br />71.9% <br />k:\dur_ldev\013284003 west orange site\t4 - analysis\[west orange site - saturday - tia data.xls]int. #6 4/23/20 <br />Overall Percent Impact <br />-70.2%75.4%70.2% <br />Eastbound Westbound Northbound Southbound <br />I-40 WB Exit Ramp US-70/I-40 Connector Road US-70/I-40 Connector Road <br />212
The URL can be used to link to this page
Your browser does not support the video tag.