Orange County NC Website
INTERSECTION ANALYSIS SHEET <br />Sat In Sat Out <br />Project:West Orange Site Net New Trips:1,251 1,201 <br />Location:Efland, NC Pass-By Trips:0 0 <br />Scenario:Saturday Peak Hour <br />Peak Hour:11:00 AM - 12:00 PM <br />Ct. Date 10/26/2019 <br />N/S Street:US-70/I-40 Connector Road Annual Growth Rate:2.0%Existing Year:2019 <br />E/W Street:I-40 EB Service Road Growth Factor:0.061208 Buildout Year:2022 <br />AM PEAK HOUR <br />AM PHF = 0.95 <br />Description Left Through Right Left Through Right Left Through Right Left Through Right <br />2019 Traffic Count 162 0 0 0 0 0 0 28 4 16 25 0 <br />Count Balancing 0 0 0 0 0 0 0 0 0 0 0 0 <br />2019 Existing Traffic 162 0 0 0 0 0 0 28 4 16 25 0 <br />Growth Factor (0.02 per year)0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 <br />2022 Background Growth 10 0 0 0 0 0 0 2 0 1 2 0 <br />2022 Background Traffic 172 0 0 0 0 0 0 30 4 17 27 0 <br />Project Traffic <br />Percent Assignment Inbound 49% 0% 0% 0% 0% 0% 0% 1% 0% 0% 0% 0% <br />Inbound Project Traffic 613 0 0 0 0 0 0 13 0 0 0 0 <br />Percent Assignment Outbound 0% 0% 0% 0% 0% 0% 0% 0% 0% 47% 1% 0% <br />Outbound Project Traffic 0 0 0 0 0 0 0 0 0 564 12 0 <br />Total External Site Traffic 613 0 0 0 0 0 0 13 0 564 12 0 <br />Total Project Traffic 613 0 0 0 0 0 0 13 0 564 12 0 <br />2022 Buildout Total 785 0 0 0 0 0 0 43 4 581 39 0 <br />Percent Impact (Approach) <br />82.8% <br />k:\dur_ldev\013284003 west orange site\t4 - analysis\[west orange site - saturday - tia data.xls]int. #5 4/23/20 <br />Overall Percent Impact <br />78.1%-27.7%92.9% <br />Eastbound Westbound Northbound Southbound <br />I-40 EB Service Road US-70/I-40 Connector Road US-70/I-40 Connector Road <br />211