Browse
Search
Planning Board - 110420 Attachment 1
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Attachment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:49:09 AM
Creation date
10/29/2020 10:32:12 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1075
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERSECTION ANALYSIS SHEET <br />Sat In Sat Out <br />Project:West Orange Site Net New Trips:1,251 1,201 <br />Location:Efland, NC Pass-By Trips:0 0 <br />Scenario:Saturday Peak Hour <br />Peak Hour:11:15 AM - 12:15 PM <br />Ct. Date 10/26/2019 <br />N/S Street:Mt. Willing Road Annual Growth Rate:2.0%Existing Year:2019 <br />E/W Street:I-40 WB Service Road Growth Factor:0.061208 Buildout Year:2022 <br />AM PEAK HOUR <br />AM PHF = 0.92 <br />Description Left Through Right Left Through Right Left Through Right Left Through Right <br />2019 Traffic Count 0 0 0 33 0 190 9 64 0 0 278 55 <br />Count Balancing 0 0 0 0 0 0 0 0 0 0 0 0 <br />2019 Existing Traffic 0 0 0 33 0 190 9 64 0 0 278 55 <br />Growth Factor (0.02 per year)0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 <br />2022 Background Growth 0 0 0 2 0 12 1 4 0 0 17 3 <br />2022 Background Traffic 0 0 0 35 0 202 10 68 0 0 295 58 <br />Project Traffic <br />Percent Assignment Inbound 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 2% 0% <br />Inbound Project Traffic 0 0 0 0 0 0 0 0 0 0 25 0 <br />Percent Assignment Outbound 0% 0% 0% 0% 32% 2% 0% 0% 0% 0% 0% 0% <br />Outbound Project Traffic 0 0 0 0 384 24 0 0 0 0 0 0 <br />Total External Site Traffic 0 0 0 0 384 24 0 0 0 0 25 0 <br />Total Project Traffic 0 0 0 0 384 24 0 0 0 0 25 0 <br />2022 Buildout Total 0 0 0 35 384 226 10 68 0 0 320 58 <br />Percent Impact (Approach) <br />39.3% <br />k:\dur_ldev\013284003 west orange site\t4 - analysis\[west orange site - saturday - tia data.xls]int. #3 4/23/20 <br />Overall Percent Impact <br />-63.3%0.0%6.6% <br />Eastbound Westbound Northbound Southbound <br />I-40 WB Service Road Mt. Willing Road Mt. Willing Road <br />209
The URL can be used to link to this page
Your browser does not support the video tag.